Installation of a Sharp ZU1 wall-mounted heat pump in Griffintown (Le Sud-Ouest, Montreal)
AirGreen installs a Sharp ZU1 wall-mounted heat pump in Griffintown: short lines, gravity drainage, consistent comfort, and quiet condos. HVAC installation services in Montreal, Laval, Longueuil, North Shore, and South Shore.
- City
- Region
- Equipment
- Brand
- Challenges
- Published
The job on one screen

The unit’s data sheet
The range as published on airgreen.ca: pick a size to see its capacity in deep cold.
| Size | Heating at −8 °C | Heating at −15 °C | Coldest certified point | COP at −15 °C | SEER | HSPF | Indicative LogisVert aid |
|---|---|---|---|---|---|---|---|
| Sharp ZU1 12 000 | 14,500 | 12,000 | −27 °C: 7,200 | 2.11 | 22.0 | 11.0 | $1,740 |
| Sharp ZU1 15 000 | 18,100 | 15,300 | −27 °C: 10,100 | 2.1 | 24.0 | 11.0 | $2,172 |
| Sharp ZU1 18 000 | 22,000 | 18,000 | −27 °C: 11,500 | 2.2 | 24.0 | 11.0 | $2,640 |
| Sharp ZU1 24 000 | 22,400 | 19,000 | −27 °C: 12,300 | 2.2 | 22.0 | 11.0 | $2,688 |
According to NEEP, it delivers 14,500 BTU/h at −8 °C (17 °F), more than at 8 °C (14,000 BTU/h). It heats as hard in moderate cold as in mild weather.
According to NEEP, its certified maximum capacity at −27 °C (−17 °F) is 7,200 BTU/h, 60% of its nominal 12,000 BTU size.
At 8 °C, its certified maximum capacity reaches 17,100 BTU/h, 42% more than its nominal 12,000 BTU size.
According to NEEP, it delivers 18,100 BTU/h at −8 °C (17 °F), more than at 8 °C (18,000 BTU/h). It heats as hard in moderate cold as in mild weather.
According to NEEP, its certified maximum capacity at −27 °C (−17 °F) is 10,100 BTU/h, 67% of its nominal 15,000 BTU size.
At 8 °C, its certified maximum capacity reaches 21,800 BTU/h, 45% more than its nominal 15,000 BTU size.
According to NEEP, it delivers 22,000 BTU/h at −8 °C (17 °F), more than at 8 °C (21,600 BTU/h). It heats as hard in moderate cold as in mild weather.
According to NEEP, its COP at −27 °C is 1.88: the highest of the ZU1 line, which ranges from 1.79 to 1.82 at that temperature.
According to NEEP, its certified maximum capacity at −27 °C (−17 °F) is 11,500 BTU/h, 64% of its nominal 18,000 BTU size.
At −27 °C, its certified minimum capacity is 3,200 BTU/h (5,500 at 8 °C). It slows down instead of cycling on and off.
According to NEEP, its certified heating capacity at −15 °C (5 °F) is 19,000 BTU/h, 79% of its nominal 24,000 BTU size. Its COP there is 2.20.
Data read live from the airgreen.ca page of each size (NEEP / AHRI certified performance). When the title names the installed size, it is highlighted; otherwise the whole range is shown. The aid shown is today’s, using Hydro-Québec’s rule ($120 per 1,000 BTU/h at −8 °C); amounts quoted in the article date from its publication. Only Hydro-Québec confirms the assistance granted.
The article, chapter by chapter
An exemplary integration into an urban condo, designed for four-season comfort
At AirGreen , we recently installed a Sharp ZU1 wall-mounted heat pump in a bright condo in Griffintown (Le Sud-Ouest, Montréal) . The space features a textured concrete ceiling, a large bay window with a sliding door to the balcony, and a shallow lintel above the window—a typical feature of the city's recent towers. Our mandate: to provide efficient, quiet, and visually understated heating/cooling without compromising glazing or circulation.
Choice of location: uniform diffusion and careful aesthetics
We position the indoor unit at the top of the wall, centered on the bay window , in order to sweep the open area (living room + dining area) without blowing directly on the occupants. This installation:
-
maximizes controlled stratification of warm air in winter and destratification in summer;
-
avoids recirculation created by vertical curtains thanks to the fine adjustment of the motorized vanes ;
-
protects the unit from direct solar gain from the window for more stable temperature readings.
The routing of the connections is carried out in a discreet vertical capping placed on the left bank of the unit, with constant clearance. The wall passage towards the outside is done in the axis, as short as possible towards the balcony, which limits the length of lines (approximately 1.5 to 2.0 m visible inside/outside) and reduces pressure losses .
Technical details of the installation (AirGreen method)
Our teams apply a rigorous procedure, compliant with RBQ and manufacturer recommendations:
-
Support and clearances
-
Level metal anchor plate, anchored into the concrete/masonry of the lintel;
-
Respect the upper and side clearances to ensure air intake and facilitate maintenance.
-
-
Drilling and sealing
-
Hole saw with guide, drilling at a slight outward slope for gravity drainage ;
-
Vapor barrier and elastomeric sealant at interfaces to block moisture and stray air;
-
Clean finish of the wall pass-through, without chips on the interior facing.
-
-
Refrigerant connections and power supply
-
Flared copper tubes with calibrated rings;
-
High density continuous insulation, butyl tape at joints;
-
14/4 communication cable between condenser and head, routed in the same cover;
-
Power supply from the outdoor unit with dedicated circuit breaker according to the prescribed rating.
-
-
Condensates
-
Gravity drainage through the wall pass-through (no pump), slope checked at level;
-
Protective sheath on the front for clean, drip-free drainage .
-
-
Pressurization, vacuum and commissioning
-
Nitrogen test to detect the slightest micro-leak;
-
Deep vacuum (≤ 500 microns) and stabilization;
-
Superheat/subcooling checks, remote control settings (modes, dehumidification, programming).
-
Why the Sharp ZU1 in a downtown condo?
The Sharp ZU1 ( R-32 refrigerant) is distinguished by:
-
DC Inverter Technology : fine modulation of the compressor, stable comfort without temperature fluctuations;
-
Quiet on the inside, ideal for compact living spaces;
-
High yields and resistance to Quebec cold (effective heating in extreme cold);
-
Advanced filtration and intelligent defrosting , limiting cycles and extending lifespan;
-
Grant compatibility when combined with current efficiency criteria (provincial program, seasonal efficiency).
In a condo, reducing line length and gravity drainage help optimize the actual COP on a daily basis. The result: less consumption, more comfort, and very quiet operation.
Site constraints and AirGreen solutions
-
Low concrete ceiling + short lintel : we chose a millimeter installation height to maintain the upper suction clearance while freeing up access to the slats.
-
Full-height glazing and vertical blinds : shutters are set to sweep mode to prevent air from collapsing onto the curtain; blowing instructions are set to extend the reach to the back of the living room.
-
Balcony access in the middle of the day : planning of drilling and installation of the condenser to minimize the time the door is down and reduce dust (continuous suction during drilling, protective covers).
Measurable result: immediate comfort and lasting performance
Upon commissioning, the occupant notes:
-
a uniform temperature throughout the open area;
-
a significant reduction in ambient noise compared to the old portable device;
-
precise control thanks to programmable scenes (presence/absence, night);
-
the possibility of an effective dehumidification mode during mid-season humid episodes.
Over the year, the R-32 + Inverter combination and the short installation of the lines contribute to significant energy savings , especially in supplementary heating mode during peaks.
Best practices and operating advice (condo)
-
Keep the set temperature stable (rather than large deviations) to enhance the Inverter modulation.
-
Clean the pre-filter every 4 to 6 weeks during periods of heavy use.
-
Leave space in front of the unit (avoid tall furniture or large plants).
-
In winter, favor a moderate setting at night to limit defrosting cycles.
-
Schedule an annual AirGreen HVAC maintenance : exchanger check, pressures, connections, condensates, calibration.
Grants and Compliance
The installed configuration meets the efficiency requirements generally required for eligibility for current grant programs . We support our customers in:
-
validate the adequate power (BTU) per zone;
-
document invoices and serial numbers ;
-
transmit the necessary files to the relevant authorities.
Why entrust your HVAC installation to AirGreen in Montreal, Laval, Longueuil, North Shore and South Shore?
-
Wall and multi-zone specialists (Sharp, Fujitsu, Midea, Gree, Zephyr, Elios, etc.);
-
Proven methodology : nitrogen test, vacuum draw, performance measurements;
-
Careful finishing (aligned cappings, rainproof seals, clean drillings);
-
Responsive after-sales service , parts and local maintenance;
-
Impartial advice on model selection based on building envelope and actual use.
Conclusion
This Sharp ZU1 wall-mounted heat pump installation in Griffintown demonstrates how a well-designed project can transform the comfort of an urban condo: uniform diffusion , silence , energy savings and aesthetic integration . With AirGreen, every detail—from drilling to programming—is designed for lasting comfort, winter and summer, throughout Greater Montreal .
The job tools
Two quick checks with real numbers: what heat costs, and what your current heaters add up to in BTU/h.
Baseboards and electric furnaces turn 1 kWh of electricity into 1 kWh of heat. A heat pump delivers more: that is its COP. At Hydro-Québec’s rate D (11.142¢/kWh above 40 kWh a day, since 1 April 2026):
Hydro-Québec: a heat pump can be up to three times more efficient than baseboards for heating in the colder months.
Estimate per kWh of heat, at the chosen temperature, using the certified COP from the product page. Taxes, access charge and backup heat not included.
Conversion: 1 W = 3.412 BTU/h. An indication, not a load calculation: baseboards and furnaces are often stronger than the real need, and they can stay as backup. AirGreen confirms the capacity on site.
How the job unfolds
The main steps of this kind of job at AirGreen. Every house has its quirks: the estimate brings them out.
We look at the room, the outside wall, the line route and where the outdoor unit will go. That is where the capacity gets chosen.
Model, capacity and price, in writing. We also check whether the model qualifies for assistance programs.
Floors and furniture protected, wall plate position marked level, wall opening located.
A single opening, with the slope the drain needs to flow outside.
Set on a stand raised above the snow, with the clearances the manufacturer requires.
Connected, insulated and protected. The opening is then sealed against water, cold air and insects.
A dedicated circuit and an accessible disconnect near the outdoor unit.
Leak test, vacuum, then start-up and a check of heating and cooling.
Remote, modes, filters: we show you the essentials before we leave.
- The on-site estimateWe look at the room, the outside wall, the line route and where the outdoor unit will go. That is where the capacity gets chosen.
- The quoteModel, capacity and price, in writing. We also check whether the model qualifies for assistance programs.
- Getting readyFloors and furniture protected, wall plate position marked level, wall opening located.
- The wall openingA single opening, with the slope the drain needs to flow outside.
- The outdoor unitSet on a stand raised above the snow, with the clearances the manufacturer requires.
- Lines, cable and drainConnected, insulated and protected. The opening is then sealed against water, cold air and insects.
- The electrical workA dedicated circuit and an accessible disconnect near the outdoor unit.
- Tests and start-upLeak test, vacuum, then start-up and a check of heating and cooling.
- The walkthroughRemote, modes, filters: we show you the essentials before we leave.
What we check on a job like this one
Each number is a point we check on site. Switch between summer and winter to watch air and heat move.
In summer, the outdoor unit rejects the house's heat outside.
Generic illustration of this type of installation, not a survey of this job site. Tap a number.
Mounted level on a wall plate, high enough for the air to reach the whole room, with enough space around it to slide the filters out easily.
The refrigerant lines, the communication cable and the drain go through the wall in a single opening, sealed against water, cold air and insects.
Two insulated copper pipes connect the two units. Outside, a line cover can protect them from sun, knocks and weather.
A shut-off switch near the outdoor unit isolates it safely for service. It must stay accessible at all times.
The compressor and the fan. In heating mode it captures heat from the outdoor air, even in winter, and moves it inside.
On the ground or on the wall, it keeps the unit above accumulated snow. The unit stays clear and defrost water can drain away.
The fan needs to blow freely. Storage, a fence or a wall too close, and efficiency drops while noise goes up.
Is your home ready?
Check what applies at your place. A "no" is not a refusal: it is what we sort out during the estimate.
Good habits, once the unit is in place
Six simple habits that keep the unit going. Your list stays on this device.
What to do, season by season
Three habits per season for this unit. They take a few minutes and prevent many calls.
- Clean the indoor unit's filters.
- Clear leaves and debris left on the outdoor unit by winter.
- Test cooling before the first hot days.
- Clean the filters more often when the unit runs a lot.
- Keep plants away from the outdoor unit.
- Check that no water drips from the indoor unit.
- Rake the leaves around the outdoor unit.
- Test heating before the first cold days.
- Book periodic maintenance before winter.
- Keep snow away from the stand and the front of the unit.
- Let the unit defrost: it is normal.
- Never hit the ice on the fins; call us if the unit stays iced up.
The right pages, at the right time
Four statements: true or false?
It all comes down to details you have just seen.
1. In heating mode, the outdoor unit can produce water.
During defrost cycles. That water must drain away without forming ice.
2. You pick the capacity with a simple square-footage rule.
Windows, insulation, orientation and how the room is used all count. Capacity is chosen on site.
3. A multi-zone connects several indoor heads to a single condenser.
One head per room, all on the same condenser. Each room keeps its own temperature.
4. The disconnect can sit behind the patio furniture.
It must stay accessible: it is what shuts the unit off for service.
0 / 4 right answers
What people ask us about this kind of work
Does a wall-mounted heat pump heat in winter?
Wall-mounted or multi-zone: how do I choose?
Where does the outdoor unit go?
Are there grants?
Do I need a permit?
How cold can it heat?
How much can I save?
How is the LogisVert assistance calculated?
Is it noisy?
The outdoor unit is covered in ice: is that normal?
Does AirGreen hold the required licences?
Is the estimate free?
No question matches. Write to us: we answer.
More jobs to see, near you
By town, by equipment or by region: browse more than 4,700 published projects.
Each dot: a town where AirGreen has published projects. The glowing dot: this job.
An on-site estimate, the right capacity, the right equipment.
The on-site estimate is free and the quote follows within 24 hours.
Text and photo: a real AirGreen Climatisation & Chauffage job. The diagrams are generic illustrations of the type of installation, not a survey of this job site. Sources of the added figures: airgreen.ca product pages (NEEP / AHRI performance), Hydro-Québec (Heat pumps page, LogisVert, read on 13 October 2026), Régie de l’énergie (rate D as of 1 April 2026).