Installation of a GREE FLEXX R32 electric furnace in Saint-Valentin
A custom-made filter housing, a clear condensate trap with a flush valve, and a suspended horizontal installation: here is the installation of a GREE FLEXX R32 central system with an integrated electric furnace in Saint-Valentin, Montérégie.

Take a tour of the installation
Each number is a point we check on site. Switch between summer and winter to watch air and heat move.
In summer, the outdoor unit rejects the house's heat outside.
Generic illustration of this type of installation, not a survey of this job site. Tap a number.
It captures or rejects heat outside. It sits on a level base, above the snow, with free space all around.
The insulated refrigerant lines enter the house through a sealed opening and run to the indoor coil.
A shut-off switch near the outdoor unit isolates it safely for service.
Sitting on the indoor module, it moves heat between the house air and the refrigerant.
Electric furnace or air handler: its fan pushes air through the ducts. The electric backup takes over in extreme cold.
Supply ducts bring air to the rooms; returns bring it back to the unit. Their condition matters as much as the unit's.
It protects the coil and the fan. A dirty filter cuts airflow, so it gets checked regularly.
It runs the heat pump and the backup heat. It must be compatible with the installed system.
A “25 x 28” written in marker on the filter housing: why maintenance is decided on the day of installation
In the photo from this Saint-Valentin project, one detail catches the eye before the unit itself: two notes written in black marker on the filter housing. “Air filter 25 x 28” and “Change every 2 months”. This is not aesthetic neglect. It is a practice we apply to every HVAC installation, and it alone addresses the most common service issue we encounter.
A homeowner who does not know the exact size of their filter ends up buying the closest size at the store, forcing it into the rack as best they can and allowing air to bypass the media around the sides. The result is not just less effective filtration: the coil gets dirty, airflow drops, and the electric heating section trips its thermal limiters at the first severe cold snap.
The context of this project
Saint-Valentin is one of the smallest municipalities in Haut-Richelieu. Scattered homes, farmland, and service times that are nothing like those in a central neighborhood of Montreal or Longueuil. This context guided two technical decisions that we detail below: choosing equipment whose routine maintenance can be performed without a service visit, and ensuring clear service access.
The customer was replacing an aging heating system and wanted to add central air conditioning to a fairly large single-story home with an open-concept area that was difficult to cool in the summer.
The system we installed
A GREE GUD60AH2/G-D(U) air handler with an integrated electric heating section, connected to an outdoor GUD60W2/NhE-D(U) unit using R32 refrigerant.
| Technical data | Value |
|---|---|
| Rated cooling capacity | 54,000 BTU/h |
| Rated heating capacity | 53,000 BTU/h |
| Modulating heating range | 35,000 to 60,000 BTU/h |
| SEER2 | 18,5 |
| HSPF2 | 10,5 — the best value in the entire FLEXX range |
| EER2 | 11,7 |
| COP | 3,4 |
| AHRI number | 217120762 |
| Certification | ENERGY STAR |
| R32 charge | 4.6 kg (162.3 oz) |
| Minimum required room area (A2L) | 13.7 m² (147.5 sq. ft.) |
| Heating range | up to -30 °C |
| Net weight of the indoor unit | 199.5 lb |
The 10.5 CPSC2 is the most relevant figure for a home in Saint-Valentin. It is a seasonal heating-efficiency rating: it accounts for mild fall periods, January thaws, and cold snaps. A system that posts the best value in its range for this rating is precisely the one suited to a home where the heating runs seven months a year.
The filter: a chosen size, not one imposed on us
Why 25 x 28 instead of a standard size
A 25 x 28 in filter provides approximately 700 in² of face area, or just under 5 sq. ft. This size was not dictated by the cabinet: we custom-built the cabinet to obtain this area.
The reason is face velocity, meaning the speed at which air passes through the filter media. Above approximately 350 ft/min, three things happen:
- pressure drop increases and the blower consumes more power;
- fine particles pass through the media instead of being captured, negating the benefit of a high-efficiency pleated filter;
- the whistling becomes audible at the return grilles.
By enlarging the cabinet, we bring the face velocity into the useful range, allowing a MERV 11 to 13 pleated filter to be installed without choking the system. A high-performance filter installed in a cabinet that is too small does more harm than good.
The “4,000 CFM” trap in the specifications
The FLEXX data sheet indicates an airflow of 4,000 CFM for this cabinet. That is the unit’s maximum capacity, not its operating point. A system with this capacity actually operates well below it, and most of the time at reduced output thanks to the inverter compressor.
We regularly see installers—and sometimes well-intentioned homeowners doing their own calculations—size a filter cabinet based on this maximum figure. They end up with unrealistic filter areas or give up on a good filter, thinking the system will not support it. Sizing should be based on the actual airflow measured during commissioning, not the catalog figure.
The two-month interval
The note “every 2 months” is not a universal rule. It is the interval we chose for this house, taking into account the agricultural environment, the presence of animals, and the fan's near-continuous operation. In a condo in Laval without animals, we would instead write “every 4 months.” The interval is customized; what matters is that it is written where the homeowner will read it.
The transparent condensate trap, with valve
The condensate drain on this job was installed in PVC with a transparent trap and a ball valve on a branch, plus two capped cleanout tees.
Three concrete advantages:
- The transparent trap allows the homeowner to check for themselves, in three seconds, that the water seal is present. A trap that dries out in winter allows the unit to draw air through the drain.
- The valve makes it possible to flush the line with lukewarm water once a year without taking anything apart.
- Cleanout tees provide access to both sides of the trap in the event of an algae blockage, which is common at the end of summer.
The installation takes longer than a simple PVC elbow. It does, however, prevent a service call 40 minutes away on a sweltering Sunday when the pan overflows because the line is clogged.
Horizontal suspended installation
The unit is installed horizontally and suspended. This configuration has requirements that vertical installation does not:
- The cabinet's slope must be checked both along its length and across its width; otherwise, the condensate pan retains water instead of draining it. We check it with a digital level, not by eye.
- The supports must bear the unit's 199.5 lb when fully loaded, with vibration isolators between the cabinet and the structure.
- The front service clearance must allow the access panels to be removed completely. On this job, the ladder visible in the photo shows that the unit is elevated: without sufficient clearance, every maintenance visit becomes a major project.
- The ceiling penetration was insulated and sealed to prevent condensation around the refrigeration lines in summer.
The A2L detection sensor and its location
R32 is an A2L refrigerant, which is mildly flammable. The appliance comes factory-equipped with a leak-detection sensor, and the cabinet bears a warning label stating that this sensor must be located in a position determined by the manufacturer.
This point is more important than it may seem with a high-mounted horizontal installation: the sensor's position is calculated based on the behavior of refrigerant vapors, which are heavier than air. An appliance reoriented without following the manufacturer's instructions could end up with a sensor positioned where it would detect nothing. We verify this location at every installation and test activation during commissioning.
The cabinet also displays the regulatory table for the minimum room area based on the charge. With 4.6 kg of R32, the room had to be at least 13.7 m² (147.5 sq. ft.), a requirement verified with a tape measure before the equipment was ordered.
How distance changes things when you live in a village in Montérégie
Choose a system whose routine maintenance does not depend on anyone
In Saint-Valentin, as in several municipalities on the South Shore far from major routes, response times are not the same as in the city. Our response is not to sell more maintenance, but to make routine maintenance self-sufficient:
- a filter housing accessible without tools, with the dimensions marked on it;
- a trap that can be inspected visually and rinsed under the tap;
- a conventional 24 VAC thermostat, replaceable with any model on the market rather than a proprietary part;
- a factory-installed Wi-Fi module that enables an initial remote diagnosis before dispatching a technician.
Subsidies: our position
- The central heat pump, certified ENERGY STAR and identified by a valid AHRI number — in this case, 217120762 — is the component that provides access to the energy-efficiency programs currently in effect.
- The electric furnace on its own is not eligible: it is a supplemental heating component.
- Conversion programs are intended for homes that are moving away from fossil fuels. Eligibility must be verified on a house-by-house basis.
- We confirm eligibility for the application using the exact AHRI number, rather than relying on a program from last year.
Three mistakes we regularly correct for other contractors
- A filter cabinet sized to the unit cabinet. It is almost always too small for a high-efficiency pleated filter. It is a modest sheet-metal addition at the time of installation, but an expensive retrofit later.
- A drain without a proper trap. An appliance under negative pressure draws air through a trap that is too short and pushes water back into the pan.
- The changeover point left at the factory settings. The heat pump heats down to -30 °C. A setting that starts the electric elements at -5 °C means paying for a high-performance system and then heating as though you had baseboard heaters.
Our maintenance schedule for this type of installation
- 25 x 28 filter: replace every 2 months, according to the labeling on the cabinet.
- Trap: visually check the water seal every time the filter is changed; rinse annually with tap water.
- Coil and drain pan: clean annually before the cooling season.
- Brackets and isolators: check the tightness annually on a suspended installation.
- Electrical section connections: check the torque once a year.
- Outdoor unit: maintain winter clearance; clean the condenser in the spring.
Our approach at AirGreen
At AirGreen, we believe that a successful HVAC installation should be judged over ten years, not on the day it is installed. The oversized filter cabinet, transparent trap, and marker labeling cost a few dozen dollars and an extra hour of work. Yet they determine most of what the homeowner will experience over the following decade.
We apply the same approach to our heat pump, ductless mini-split air conditioner, electric furnace, and HVAC maintenance projects in Montreal, Laval, Longueuil, across the North Shore, and throughout the South Shore, from densely populated neighborhoods to the agricultural villages of Haut-Richelieu.
The big day, step by step
The main steps of this kind of job at AirGreen. Every house has its quirks: the estimate brings them out.
We look at the ducts, the current indoor module, the electrical panel and the planned spot for the outdoor unit.
The equipment combination, capacity and price, in writing. We check whether the combination qualifies for assistance programs.
Access protected, old unit disconnected and removed when it is being replaced.
Electric furnace or air handler, with its coil, connected to the supply and return ducts.
On a level base, raised above the snow, with free space all around.
Insulated, they enter through a sealed opening and run to the indoor coil.
Dedicated circuits, accessible disconnect, a thermostat that works with the heat pump and the backup heat.
Leak test, vacuum, start-up, airflow check and a test of both modes.
Filter, thermostat, backup heat in extreme cold: what to know before winter.
- The on-site estimateWe look at the ducts, the current indoor module, the electrical panel and the planned spot for the outdoor unit.
- The quoteThe equipment combination, capacity and price, in writing. We check whether the combination qualifies for assistance programs.
- Getting readyAccess protected, old unit disconnected and removed when it is being replaced.
- The indoor moduleElectric furnace or air handler, with its coil, connected to the supply and return ducts.
- The outdoor unitOn a level base, raised above the snow, with free space all around.
- The refrigerant linesInsulated, they enter through a sealed opening and run to the indoor coil.
- Electrical and thermostatDedicated circuits, accessible disconnect, a thermostat that works with the heat pump and the backup heat.
- Tests and start-upLeak test, vacuum, start-up, airflow check and a test of both modes.
- The walkthroughFilter, thermostat, backup heat in extreme cold: what to know before winter.
What would it look like at your place?
Two quick checks with real numbers: what heat costs, and what your current heaters add up to in BTU/h.
Conversion: 1 W = 3.412 BTU/h. An indication, not a load calculation: baseboards and furnaces are often stronger than the real need, and they can stay as backup. AirGreen confirms the capacity on site.
Four mistakes we do not make
Flip each card to see what we do instead.
Your own project, step by step
What to do, season by season
Three habits per season for this unit. They take a few minutes and prevent many calls.
- Check the indoor module's filter.
- Clear winter debris from the outdoor unit.
- Test cooling before the heat arrives.
- Check the filter more often in peak season.
- Keep registers and returns clear.
- Watch condensate drainage near the coil.
- Change or clean the filter.
- Test heating and backup heat before the cold.
- Book periodic maintenance.
- Clear snow around the outdoor unit.
- Store nothing in front of the indoor module.
- Note any unusual noise or smell and call us.
Is your home ready?
Check what applies at your place. A "no" is not a refusal: it is what we sort out during the estimate.
Four statements: true or false?
It all comes down to details you have just seen.
1. A central heat pump uses the house's ducts.
It connects to the existing ducts to heat and cool everywhere.
2. In extreme cold, electric backup heat can take over.
The indoor module (furnace or air handler) works with the heat pump and takes over in extreme cold.
3. The filter only gets changed when the unit breaks down.
A dirty filter cuts airflow. It gets checked regularly.
4. You can reuse the old unit's size without checking.
The house may have changed: insulation, windows, added rooms. Capacity is confirmed on site.
0 / 4 right answers
What people ask us about this kind of work
Can I keep my current ducts?
What happens in extreme cold?
Furnace, air handler, ducted: what is the difference?
Are there grants?
Do I need a permit?
How much can I save?
How is the LogisVert assistance calculated?
Will my current thermostat work?
Central or wall units: which one?
Does AirGreen hold the required licences?
Is the estimate free?
No question matches. Write to us: we answer.
More jobs to see, near you
By town, by equipment or by region: browse more than 4,700 published projects.
Each dot: a town where AirGreen has published projects. The glowing dot: this job.
Every house has its constraints. We see them before we install.
The on-site estimate is free and the quote follows within 24 hours.
Text and photo: a real AirGreen Climatisation & Chauffage job. The diagrams are generic illustrations of the type of installation, not a survey of this job site. Sources of the added figures: airgreen.ca product pages (NEEP / AHRI performance), Hydro-Québec (Heat pumps page, LogisVert, read on 13 October 2026), Régie de l’énergie (rate D as of 1 April 2026).
