Installation of a MIDEA EVOX G3 electric furnace in Bois-des-Filions on Montreal’s North Shore, in a basement with existing ductwork and a stone wall
In Bois-des-Filions, AirGreen integrates a MIDEA EVOX G3 electric furnace between an existing duct network and a stone wall, including drainage, a condensate pump, R-454B connections, and complete adaptation of the central system.
- City
- Region
- Equipment
- Brand
- Challenges
- Published
The job on one screen

The article, chapter by chapter
A MIDEA EVOX G3 installation where the real challenge was around the furnace: substantial ductwork, stone foundation, drainage, and limited workspace
This MIDEA EVOX G3 electric furnace installation in Bois-des-Filions is an excellent example of what modernizing a central HVAC system in an existing home on the North Shore of Montreal. On paper, the project may seem simple: remove or replace an indoor unit and connect the new module to the duct network. On site, the reality is much more technical.
The photo of our worksite immediately shows several constraints: an exposed stone foundation wall, a substantial galvanized sheet-metal duct network, a large vertical section with an existing grille, round ducts at the ceiling, limited clearance around the unit, and drainage that required a clean and accessible solution.
We installed the The in a vertical position, on a suitable metal base, and then we integrated the refrigerant connections, drainage, and duct transitions without turning this already dense space into an impossible-to-maintain assembly.
It is precisely in this kind of basement that the quality of an HVAC installation also becomes just as important as the unit's technical specifications.
A photo that shows much more than a new furnace
Several interesting aspects of the project are visible at the same time.
On the left, we can see the indoor unit TheImmediately to its right is a large section of existing metal ductwork. The system then rises toward the ceiling, where several round ducts distribute air throughout the property.
The configuration also includes:
- a insulated refrigerant line descending toward the coil;
- the visible copper connections in the lower section;
- a accessible condensate trap with service caps;
- a compact condensate pump installed at the base of the system;
- a sheet-metal base and transitions fabricated to connect to the existing installation;
- a PVC drainage section;
- service clearance maintained in front of the unit;
- floor protection installed during the work.
This last part is important. In a finished or semi-finished basement, our work is not limited to the equipment. We also organize our workspace to reduce the risk of dirt, marks, or damage during handling and connections.
Why this Bois-des-Filions installation was particularly interesting
The existing system already occupied a large part of the mechanical area.
On the right side, the large vertical duct obviously could not be moved arbitrarily: it is part of the home's air-distribution system. The stone wall also limits the possibilities for modification. At the ceiling, the existing ducts determine where the new unit must ultimately connect to the air distribution.
We therefore had to work with the building, and not against it.
This is an essential distinction when a homeowner compares an installation in a new home with an electric furnace replacement in Bois-des-Filions, Laval, Montréal, or on the North Shore. In new construction, we can sometimes design the mechanical room around the equipment. In a renovation, we must design the installation around several elements that are already there.
The modular design of the MIDEA EVOX G3 makes perfect sense in a basement
One of the most relevant advantages of the The is its modular design called Block N Lock.
According to MIDEA documentation, the unit is designed to be separated into easier-to-handle modules and can be configured in six different orientations, including vertical upflow, downflow, left horizontal, right horizontal, as well as “low-boy” configurations when available height is limited.
MIDEA specifically states that this design is intended to facilitate handling in difficult locations such as basements and attics, two situations in which transporting a monolithic unit can become a problem in itself.
For our teams, this represents a very practical advantage.
A central furnace sometimes has to be taken down through:
- a narrow staircase;
- a narrow door;
- a passage with a low ceiling;
- a corridor where it is impossible to turn a fully assembled cabinet;
- an already occupied mechanical room.
The ability to handle the modules more easily reduces constraints even before the connections begin.
The large existing metal duct is not something to work around without careful thought
The most prominent part of this photograph is hardly the MIDEA unit itself: it is the adjacent ductwork.
This recalls a fundamental principle of any central ducted system : the unit and the ducts must operate as a single system.
We must take into account the required air volume, static pressure, and the resistance created by:
- transitions;
- elbows;
- filters;
- grilles;
- remote branches;
- dimensional reductions;
- the previous additions to the network.
A new unit does not automatically correct the weaknesses of an old duct system.
That is why our work always includes consideration of the connections, not just the furnace's physical location.
Constant airflow technology is particularly helpful during a replacement
R-454B: the new generation is clearly identified as A2L EVOX G3 uses the technology Computational Constant Airflow 2.0.
MIDEA indicates that this function adjusts the fan's power and speed to maintain the target airflow despite changes in system resistance. The documentation describes operation of up to approximately 1.2 in. of external static pressure and up to 60 airflow adjustment levels.
In an existing home in Bois-des-Filions, this function is particularly useful.
The system resistance can change when:
- the filter begins to accumulate dust;
- some grilles are adjusted;
- the system has different lengths;
- filtration is improved;
- the static pressure is not exactly the same as with the old furnace.
The ECM fan can then better compensate for these variations.
However, we never consider this technology permission to retain an obviously inadequate system. An undersized return, a blocked duct, or an improper transition must always be properly evaluated.
The condensate pump visible at the base of the unit is not a decorative accessory
One of the most interesting details of this installation is located almost at floor level: the condensate pump.
When the indoor coil operates in cooling mode, it cools the air below its dew point and produces water. This water must be drained reliably.
When the building configuration does not allow simple gravity drainage to a suitable drain, a condensate pump may be the most practical solution.
On this installation, we can see an assembly comprising:
- the drainage connection to the module;
- an accessible trap;
- plugs allowing maintenance;
- a PVC pipe;
- a condensate pump installed on the floor.
This arrangement also facilitates future servicing.
An inaccessible trap or a drain that cannot be cleaned may function perfectly for the first few weeks, then become the source of a service call several years later. We therefore prefer to consider cleaning from the day of installation.
Why the trap is important
The trap ensures proper water drainage in the presence of pressure differences created by the fan.
Depending on the configuration of the coil and fan, improper drain installation can disrupt condensate flow.
In our work, we therefore check:
The slope
The water must move in the right direction without creating an unnecessary stagnant pocket.
Accessibility
We must be able to clean the system without dismantling the entire installation.
Sealing
The connections must prevent leaks in the mechanical room.
The pump
When necessary, it must be installed in a location where it can be inspected and replaced without significantly moving the equipment.
In the Bois-des-Filions photo, the entire drainage assembly remains clearly visible and accessible.
A properly insulated refrigerant line also protects the building
The large pipe running down in front of the side of the system is covered with continuous insulation.
This is necessary because its temperature may be low enough to cause condensation on an uninsulated pipe.
In a basement, this repeated condensation could wet:
- the ducts;
- the adjacent materials;
- the floor;
- certain electrical components.
Properly installed insulation also helps limit unnecessary heat exchange between the refrigerant and the surrounding air.
In a tight space, however, we must strike a balance: protect the lines while avoiding blocking access to the panels and service valves.
What the MIDEA EVOX G3 brings to a Bois-des-Filions home when properly integrated with a central heat pump
A central platform designed for multiple capacities
The name The refers to a range rather than a single capacity.
The technical documentation presents systems ranging from approximately 18,000 to 54,000 BTU/h of nominal cooling capacity, depending on the combination of the indoor unit and the outdoor heat pump.
The nameplate of the photographed unit is not legible enough for us to reliably confirm the exact capacity installed at this site. We therefore prefer not to turn a visual estimate into a technical specification.
In our work, the appropriate capacity depends in particular on:
- the property's heat load;
- insulation level;
- heated area;
- fenestration;
- exposure;
- available duct airflow;
- heating needs in very cold weather.
The right capacity is not necessarily the largest capacity available.
Efficiency ratings that vary depending on the exact combination
According to the configurations presented by the manufacturer, the EVOX G3 range reaches up to:
- 19 SEER2;
- 12.5 EER2;
- 10.8 HSPF2;
- a COP at 5°F (-15°C) of up to 2.14.
The table on page 11 of the brochure also confirms that these values are not identical for every capacity: the 18,000, 24,000, 30,000, 36,000, 48,000, and 54,000 BTU systems have their own performance ratings and model numbers.
That’s why we always recommend comparing the indoor and outdoor model numbers, rather than merely the words “EVOX G3” on two quotes.
A heat pump designed for North Shore temperatures
When paired with a corresponding EVOX Extreme Heat heat pump, this system is designed to operate at very low temperatures.
MIDEA announces continuous operation down to -30 °C. The manufacturer also indicates up to 100% heating capacity at -25 °C, with a COP of approximately 1,9 under the conditions specified in its documentation.
These data are particularly relevant in Bois-des-Filions and on the North Shore, where a heat pump's winter capacity deserves as much attention as its summer efficiency.
When selecting a central system, we therefore do not limit ourselves to asking how many tons it produces in cooling. We also want to know what it can deliver when the outdoor temperature truly drops.
Auxiliary electric heating: up to 25 kW available, but the maximum is not always the right choice
The EVOX G3 range can accommodate a three-stage auxiliary electric heating kit rated up to 25 kW. MIDEA offers 10, 15, and 25 kW options and specifies that activation can be adjusted progressively according to temperature needs.
In a Quebec home, this auxiliary heating may be used:
- when demand temporarily exceeds the heat pump's capacity;
- during certain defrost conditions;
- as backup heating;
- during a request for rapid temperature recovery.
However, we do not automatically choose the largest element.
The power must be matched to the heating load and the property's actual electrical capacity. Oversizing the auxiliary heating can unnecessarily increase power demand.
A design intended to replace existing central equipment
Page 5 of the MIDEA documentation emphasizes renovations and replacements.
The EVOX G3 is available in widths of approximately 14.5 to 21.5 inches, corresponding to the standard dimensions of existing central units. The range also uses a multivoltage architecture on the relevant modules to facilitate integration with different installations.
On a project like the one in Bois-des-Filions, this compactness is valuable.
The photo clearly shows that we did not have an empty four-by-four-meter room. We had a space already structured by the ductwork, foundation, and existing installations.
24 V control or communication: valuable flexibility for renovations
MIDEA offers several control methods for the EVOX platform.
The documentation mentions communication 485 ainsi que la compatibilité avec des systèmes as well as compatibility with systems 24 V
and certain third-party thermostats. The system can also recognize the type of control in certain configurations.
During renovations, this can prevent unnecessary work.
If an existing cable is suitable and compatible with the selected configuration, we can sometimes retain part of the infrastructure instead of opening several finished walls.
- Each case is nevertheless different. We always check:
- the number of conductors;
- the thermostat type;
- the heating stages;
- the heat pump functions;
the auxiliary heating strategy.
R-454B: the new generation is clearly identified as A2L The MIDEA EVOX G3 uses the refrigerant R-454B 466 in the documented range. MIDEA indicates a global warming potential of
and classifies this refrigerant as A2L.
For the homeowner, this change has little impact on daily use.
For our technicians, however, it requires following procedures and practices suited to A2L refrigerants.
We therefore do not treat a new R-454B system exactly like an older R-410A installation.
MERV 13 filtration can be worthwhile, but only with a system capable of supporting it The range includes filtration modules that can accommodate filters of, including media MERV 13. MIDEA highlights their ability to capture more dust, pollen, particles, and pet-related contaminants.
Nevertheless, we always check static pressure before recommending more restrictive filtration.
A higher-performance filter installed on a surface that is too small can reduce airflow. In an existing system like the one seen in Bois-des-Filions, analyzing the complete system therefore remains essential.
LogisVert: the complete heat pump must be eligible, not just the furnace
For a homeowner of Bois-des-Filions, the question of the Hydro-Québec rebate often comes up very quickly when replacing a central system.
In 2026, Hydro-Québec requires that heat pumps installed since November 26, 2025 are certified ENERGY STAR to be eligible for the Heat Pump measure under the LogisVert program. When all conditions are met, the incentive is $50 per 1,000 BTU/h at -8°C for an ENERGY STAR heat pump and $120 per 1,000 BTU/h at -8°C for an ENERGY STAR Cold Climate heat pump.
The amount is therefore not calculated based simply on the nominal capacity listed as “3 tons” or “36,000 BTU.” Hydro-Québec uses the recognized capacity at -8°C for the eligible system.
The indoor furnace must also be distinguished from the complete system. Hydro-Québec notably indicates that Replacing only one indoor or outdoor unit is not eligible. to this measure.
That is why we verify the exact match, ideally using the corresponding AHRI number or ENERGY STAR identifier, rather than promising a rebate simply because the equipment bears the name MIDEA EVOX G3. Hydro-Québec also recommends using AHRI to quickly search for an eligible combination.
What we would absolutely avoid on a similar installation
Installing the furnace before planning the drainage
In this space, the pump and trap occupy a specific area at the base of the system. If we had waited until the end to think about the drain, its routing could have become unnecessarily complicated.
Blocking access to the connections with the refrigerant lines
Insulated lines must be protected, but they must also leave technical access points usable.
Reducing the ductwork abruptly to connect to the new unit
An improvised transition can increase noise and static pressure.
Choosing the capacity solely based on the old unit
Replacement equipment must be sized according to the building’s current needs.
Installing maximum electric heating without checking the panel
The availability of a 25 kW kit does not mean it is suitable for every home.
Confusing product performance with installation performance
Even the best central unit cannot compensate for poor return air, an improperly built drain, or neglected commissioning.
An HVAC renovation where the existing system becomes part of the project, not an obstacle to ignore
This MIDEA EVOX G3 installation in Bois-des-Filions perfectly sums up our approach at AirGreen.
We had to integrate a next-generation unit into an environment where the main ductwork, stone wall, and physical constraints already existed. The solution therefore required much more than a simple electrical connection.
We focused our attention on:
- the positioning of the indoor unit;
- integration into the ductwork;
- airflow;
- the refrigerant line routing;
- insulation;
- the trap;
- the condensate pump;
- service access;
- the possibility of carrying out HVAC maintenance future without having to rebuild the installation.
This is the kind of detail that makes the difference between a machine that is simply installed and a a central system properly integrated into the home.
At AirGreen, we carry out electric furnace, central heat pump, and HVAC installation to Bois-des-Filionsthroughout the North Shoreas well as the Montréal, Laval, Longueuil, and the South ShoreFor each project, we adapt the equipment to the actual building: its ductwork, mechanical space, electrical supply, and heating needs.
The job tools
Two quick checks with real numbers: what heat costs, and what your current heaters add up to in BTU/h.
Conversion: 1 W = 3.412 BTU/h. An indication, not a load calculation: baseboards and furnaces are often stronger than the real need, and they can stay as backup. AirGreen confirms the capacity on site.
How the job unfolds
The main steps of this kind of job at AirGreen. Every house has its quirks: the estimate brings them out.
We look at the ducts, the current indoor module, the electrical panel and the planned spot for the outdoor unit.
The equipment combination, capacity and price, in writing. We check whether the combination qualifies for assistance programs.
Access protected, old unit disconnected and removed when it is being replaced.
Electric furnace or air handler, with its coil, connected to the supply and return ducts.
On a level base, raised above the snow, with free space all around.
Insulated, they enter through a sealed opening and run to the indoor coil.
Dedicated circuits, accessible disconnect, a thermostat that works with the heat pump and the backup heat.
Leak test, vacuum, start-up, airflow check and a test of both modes.
Filter, thermostat, backup heat in extreme cold: what to know before winter.
- The on-site estimateWe look at the ducts, the current indoor module, the electrical panel and the planned spot for the outdoor unit.
- The quoteThe equipment combination, capacity and price, in writing. We check whether the combination qualifies for assistance programs.
- Getting readyAccess protected, old unit disconnected and removed when it is being replaced.
- The indoor moduleElectric furnace or air handler, with its coil, connected to the supply and return ducts.
- The outdoor unitOn a level base, raised above the snow, with free space all around.
- The refrigerant linesInsulated, they enter through a sealed opening and run to the indoor coil.
- Electrical and thermostatDedicated circuits, accessible disconnect, a thermostat that works with the heat pump and the backup heat.
- Tests and start-upLeak test, vacuum, start-up, airflow check and a test of both modes.
- The walkthroughFilter, thermostat, backup heat in extreme cold: what to know before winter.
What we check on a job like this one
Each number is a point we check on site. Switch between summer and winter to watch air and heat move.
In summer, the outdoor unit rejects the house's heat outside.
Generic illustration of this type of installation, not a survey of this job site. Tap a number.
It captures or rejects heat outside. It sits on a level base, above the snow, with free space all around.
The insulated refrigerant lines enter the house through a sealed opening and run to the indoor coil.
A shut-off switch near the outdoor unit isolates it safely for service.
Sitting on the indoor module, it moves heat between the house air and the refrigerant.
Electric furnace or air handler: its fan pushes air through the ducts. The electric backup takes over in extreme cold.
Supply ducts bring air to the rooms; returns bring it back to the unit. Their condition matters as much as the unit's.
It protects the coil and the fan. A dirty filter cuts airflow, so it gets checked regularly.
It runs the heat pump and the backup heat. It must be compatible with the installed system.
Is your home ready?
Check what applies at your place. A "no" is not a refusal: it is what we sort out during the estimate.
Good habits, once the unit is in place
Six simple habits that keep the unit going. Your list stays on this device.
What to do, season by season
Three habits per season for this unit. They take a few minutes and prevent many calls.
- Check the indoor module's filter.
- Clear winter debris from the outdoor unit.
- Test cooling before the heat arrives.
- Check the filter more often in peak season.
- Keep registers and returns clear.
- Watch condensate drainage near the coil.
- Change or clean the filter.
- Test heating and backup heat before the cold.
- Book periodic maintenance.
- Clear snow around the outdoor unit.
- Store nothing in front of the indoor module.
- Note any unusual noise or smell and call us.
The right pages, at the right time
Four statements: true or false?
It all comes down to details you have just seen.
1. A central heat pump uses the house's ducts.
It connects to the existing ducts to heat and cool everywhere.
2. In extreme cold, electric backup heat can take over.
The indoor module (furnace or air handler) works with the heat pump and takes over in extreme cold.
3. The filter only gets changed when the unit breaks down.
A dirty filter cuts airflow. It gets checked regularly.
4. You can reuse the old unit's size without checking.
The house may have changed: insulation, windows, added rooms. Capacity is confirmed on site.
0 / 4 right answers
What people ask us about this kind of work
Can I keep my current ducts?
What happens in extreme cold?
Furnace, air handler, ducted: what is the difference?
Are there grants?
Do I need a permit?
How much can I save?
How is the LogisVert assistance calculated?
Will my current thermostat work?
Central or wall units: which one?
Does AirGreen hold the required licences?
Is the estimate free?
No question matches. Write to us: we answer.
More jobs to see, near you
By town, by equipment or by region: browse more than 4,700 published projects.
Each dot: a town where AirGreen has published projects. The glowing dot: this job.
An on-site estimate, the right capacity, the right equipment.
The on-site estimate is free and the quote follows within 24 hours.
Text and photo: a real AirGreen Climatisation & Chauffage job. The diagrams are generic illustrations of the type of installation, not a survey of this job site. Sources of the added figures: airgreen.ca product pages (NEEP / AHRI performance), Hydro-Québec (Heat pumps page, LogisVert, read on 13 October 2026), Régie de l’énergie (rate D as of 1 April 2026).