Job sheet · Project

Installation of a MIDEA EVOX G3 electric furnace in Charlemagne

In Charlemagne, AirGreen installs a MIDEA EVOX G3 electric furnace and opens its panels for precise integration: controls, fan, ductwork, auxiliary heating, and commissioning of the central system.

By AirGreen Climatisation & Chauffage Admin15 min read
City
Region
Equipment
Brand
Challenges
Published
–chapters, to open one by one
15 minto read the whole story
–type of installation
2026year published
At a glance

The job on one screen

The full story

The article, chapter by chapter

In Charlemagne, a vertical installation where the complete opening of the MIDEA EVOX G3 reveals what really makes the difference

At this installation carried out by AirGreen in Charlemagne, the photograph was taken at a particularly interesting point in the project: the panels of the new MIDEA EVOX G3 electric furnace are removed and the internal components are directly accessible. Rather than simply showing a closed and finished cabinet, this image makes it possible to see what a homeowner almost never sees once their HVAC system is in service.

We can distinguish the electronic module and its control boards in the upper-left section, the internal wiring, the large ventilation assembly in the center, the refrigeration circuit components lower down, as well as the junction between the two modular sections of the unit. Above the MIDEA EVOX G3, a galvanized sheet-metal transition connects the new unit to the home's duct network.

This vertical installation in Charlemagne, on Montreal's North Shore, illustrates an important reality very well: replacing an old furnace with a modern central system does not simply mean installing a gray cabinet between two pieces of ductwork. We must verify the mechanical integration, airflow, controls, refrigeration connections, auxiliary electric heating, and the configuration of the existing duct network before all the panels are closed.

A modern electric furnace whose interior is very different from older installations

In Quebec, we naturally use the term electric furnace to refer to the appliance that heats and circulates air through the home's ducts.

However, the MIDEA EVOX G3 belongs to a much more integrated generation of central systems. Technically, it is an air handler that can be paired with a variable-speed central heat pump and an auxiliary electric heating module.

This means that the heat can come from two complementary sources:

  • the heat pump, which transfers heat through its refrigeration circuit;
  • the auxiliary electric heating elements, which can operate when the heating demand increases or when the control strategy requires it.

For this range, Midea provides auxiliary heating modules capable of reaching 25 kW, with intermediate configurations and staged control to adjust the heat output to the demand.

This architecture is very different from an older electric furnace that operates mainly with heating elements and a much simpler fan.

The photo shows the MIDEA EVOX G3 during an actual stage of the work

At our Charlemagne job site, the front panels had been removed to access the components.

We can clearly observe the electronic control board, several control connectors, the wiring harnesses, as well as the compartment containing the fan. This accessibility is important for the initial installation, but it will be just as important several years later when a technician needs to perform a diagnostic or HVAC maintenance.

We can also see the modular cabinet structure. The two sections do not simply form one large monolithic box: they are connected by the mechanical system specific to the EVOX G3 design.

Midea presents this architecture as a modular, interlocking design that makes it easier to handle the different parts of the unit. The system can be configured in several ways, including upflow, downflow, right-horizontal, or left-horizontal configurations, as well as certain low-profile applications.

In Charlemagne, we were working with a vertical configuration, which matched the available ductwork and mechanical space well.

Adapt the new cabinet to the existing ductwork rather than compromising airflow

The metal transition visible above the unit is an essential part of the installation.

When the dimensions of the new unit and those of the existing system do not match perfectly, we must fabricate or adapt a transition to ensure a proper mechanical connection.

A poor transition can cause several problems:

  • restricted airflow;
  • turbulence;
  • more noise;
  • an increase in static pressure;
  • uneven air distribution in the rooms.

That is why we never look only at the outside width of the new furnace.

The advantage of the EVOX G3 range is that Midea specifically worked on formats corresponding to the common widths of central systems. The documentation indicates cabinets approximately 14.5 to 21.5 inches wide, depending on the capacity, to facilitate the replacement of existing equipment.

This can reduce the modifications required, but professional adaptation of the system is often still essential.

Why we inspect the interior before closing the panels

A central system should always be inspected before it is permanently closed up.

In this photo, the unit is still in the work phase. This is precisely when we can visually confirm several elements before final commissioning.

In particular, we check:

  1. the electrical and control connections;
  2. the connectors for the various components;
  3. the mechanical fastening of the modules;
  4. the wiring layout;
  5. the refrigeration connections;
  6. the coil drainage;
  7. the installation of the auxiliary heating when provided;
  8. the compatibility of the controls and thermostat.

Once the panels are closed, the appliance must operate as an integrated system. The preparation taking place behind these panels is therefore just as important as the finished work’s exterior appearance.

A fan designed to better manage existing duct networks

The large cylindrical assembly visible in the center of the unit is the ventilation system.

It is responsible for pushing or pulling enough air through the filter, coil, and the residence’s entire duct network.

Midea places particular emphasis on its Computational Constant Airflow 2.0. It is designed to adjust the capacity and fan speed according to the resistance encountered in the network. The documentation specifies operation capable of handling up to 1.2 in. of water column static pressure under certain conditions.

The system also offers up to 60 air-volume adjustment levels, making it possible to fine-tune operation according to the installation’s needs.

For us, this possibility is particularly interesting in replacement projects in Charlemagne, Repentigny, Terrebonne, Laval, or elsewhere on the North Shore, where the duct network may be several years old.

However, an important nuance must be understood: advanced ventilation technology does not turn an undersized duct into a properly sized duct.

If a significant restriction exists, we must acknowledge it and address it as such.

A range covering several residential capacities

The EVOX G3 documentation includes several central system capacities: 18,000, 24,000, 30,000, 36,000, 48,000, and 54,000 BTU/h, depending on the combination of the indoor unit and outdoor heat pump.

However, the photograph of our Charlemagne installation does not show a sufficiently legible nameplate to confirm the complete suffix of the installed model without ambiguity.

We therefore prefer not to assign a specific tonnage to this unit based solely on its apparent size.

This point is important in our installation articles: two very similar cabinets may belong to different capacity classes.

To choose the right capacity, we consider in particular:

  • the heated floor area;
  • the building’s insulation;
  • window area;
  • heat losses;
  • the airflow the ducts can actually carry;
  • the heating capacity required on cold days;
  • the electric backup configuration.

Oversizing equipment does not automatically make it more comfortable. The capacity must match the building.

Up to 19 SEER2 depending on the EVOX G3 combination

The product specification sheet for the range lists efficiency ratings that vary depending on the equipment pairings.

Midea announces performance of up to 19 SEER2, 12.5 EER2, 10.8 HSPF2 and a COP at 5 °F, approximately -15 °C, that can reach 2,14, depending on the combination.

The technical table in the documentation clearly shows that not all capacities have exactly the same values. For example, the listed 30,000, 36,000, 48,000, or 54,000 BTU/h systems each have their own performance data.

That is why, at AirGreen, we always talk about combination of models when a customer wants to know the SEER2, HSPF2, or precise eligibility of a central heat pump.

A system intended for cold-climate heating

In the Montreal area, a central heat pump must be seriously evaluated for its winter performance.

Midea documentation indicates advertised continuous operation down to -30 °C. It also offers, for the system used in the tests cited by the manufacturer, up to 100% heating capacity around -25 °C, with a COP that can reach approximately 1,9 under these conditions.

This represents a significant change from older generations of heat pumps, which many homeowners still associate with heating that had to be shut off as soon as the weather became very cold.

With a modern system, we instead aim to operate the central heat pump as efficiently as possible while intelligently integrating electric backup heat.

Electric heating must be properly sized, not simply maximized

Because the EVOX G3 can receive up to 25 kW of auxiliary heating, it would be easy to assume that a larger module is always better.

That is not how we proceed.

A larger electric heating element also requires a power supply capable of supporting it. The following must be taken into account:

  • the electrical panel;
  • the available capacity;
  • the conductors;
  • the protection devices;
  • of the home’s heating load;
  • of the heat pump’s actual low-temperature capacity.

The right choice is the one that meets the building’s demand without unnecessarily adding excessive electrical load.

The details of this Charlemagne installation that continue to matter long after our technicians leave

A modern control board requires more precise commissioning

The circuit board visible in the upper part of the unit shows just how much a modern electric furnace has become both a control system and a mechanical system.

The EVOX G3 platform is designed to operate with different communication modes. Midea specifically indicates compatibility with communication 485 and with certain configurations using a conventional thermostat 24 V.

This flexibility can be very useful during a renovation.

In some homes, the thermostat wiring is easily replaceable. In others, it runs behind several finished walls, making replacement much more complex.

The ability to adapt the control strategy to the existing installation can therefore reduce unnecessary work, provided that the selected equipment combination is compatible.

R454B: a new reality for central systems

The EVOX G3 range described in this documentation uses R454B refrigerant, classified as A2L.

Midea states that R454B has a global warming potential of 466 and states that it selected it for its range of equipment presented.

For the homeowner, day-to-day operation remains familiar. For an HVAC contractor, however, using an A2L refrigerant requires appropriate practices, equipment, and procedures.

This includes work on the refrigeration circuit, the tools used, and the manufacturer’s instructions.

More advanced filtration can be integrated into the system

The range also includes a module compatible with filters 1-, 2-, or 4-inch MERV 13, depending on the configuration. Midea states that these filters can capture more dust, pollen, and particles, as well as pet hair and dander.

However, filtration should never be selected independently of airflow.

A more restrictive filter can increase static pressure. We therefore always check whether the system, return air, and fan can operate properly with the selected filtration.

What this installation reminds us about service access

The photograph from Charlemagne also provides an excellent example of what “service access” really means.

The panels are open, and the main components are visible from the front. A technician can reach the circuit boards, fan, and other internal components without having to dismantle part of the building.

This aspect may seem secondary when purchasing a new heat pump, but it becomes extremely important during a future service call.

We recommend never blocking the front of a furnace with:

  • permanent shelving;
  • walls built too close;
  • water heaters or appliances added later;
  • boxes and stored items;
  • ductwork installed in front of the panels.

A good HVAC installation must remain serviceable.

Mistakes we avoid when replacing a central furnace

On this type of project, several mistakes can compromise excellent equipment.

Relying solely on the old unit’s tonnage

An old furnace may be oversized. We must not automatically reproduce a sizing error from several decades ago.

Installing a transition that is too restrictive

A nice sheet-metal component is not enough. Its geometry must allow air to flow properly.

Neglecting the fan settings

A variable-airflow unit must be configured. Leaving unsuitable settings can cause noise, poor distribution, or reduced performance.

Installing the maximum amount of electric heating without calculations

A high-capacity module places a significant load on the electrical panel. The capacity must match the actual requirements.

Closing the unit without a complete inspection

The connections, controls, and components must be inspected before the panels are permanently closed.

This is precisely the stage of the installation shown in our photograph from Charlemagne.

And what about rebates for a MIDEA EVOX G3?

A common mistake is to assume that a complete series is automatically eligible for financial assistance as soon as a heat pump from that family has good performance ratings.

In reality, eligibility for a central system must be verified based on the exact combination of the indoor and outdoor units.

The technical documentation itself presents several different pairings, including the indoor units MAUSE associated with the outdoor units MO1HE of different capacities.

The complete model numbers of both units must therefore be used to verify certification and the applicable program criteria in Quebec at the time of installation.

Furthermore, the financial incentives described at the beginning of the supplied brochure concern programs American in California, New York State, and Oregon; they must not be used to determine the subsidy applicable to an installation in Charlemagne.

We therefore provide no specific amount for this project without the exact combination of models and validation of the applicable Quebec program.

A central installation whose quality is determined behind the panels

The photo of this MIDEA EVOX G3 in Charlemagne represents a stage that the owner will probably no longer see once the system is complete: the inside of the open machine, accessible components, and the technical work still visible.

Yet this is where much of the installation's quality is determined.

The transition to the ductwork must be correct. The modules must be properly assembled. The fan must be configured for the network. The auxiliary heating must match the building. The controls must communicate properly, and the components must remain accessible.

At AirGreen, we apply this approach to our electric furnaces, central heat pumps, and HVAC systems to Charlemagne, Montreal, Laval, Longueuil, on the North Shore and the South Shore.

A successful installation is not simply one that produces warm air when we turn on the thermostat.

It is the one that combines sizing, airflow, low-temperature heating, duct integration, connection quality, and ease of maintenance so that the system continues to operate properly long after the work is complete.

Your numbers

The job tools

Two quick checks with real numbers: what heat costs, and what your current heaters add up to in BTU/h.

Size checkYour electric furnace, in BTU/h
–BTU/h of installed electric heat

    Conversion: 1 W = 3.412 BTU/h. An indication, not a load calculation: baseboards and furnaces are often stronger than the real need, and they can stay as backup. AirGreen confirms the capacity on site.

    The steps

    How the job unfolds

    The main steps of this kind of job at AirGreen. Every house has its quirks: the estimate brings them out.

    Step 1 of 9The on-site estimate

    We look at the ducts, the current indoor module, the electrical panel and the planned spot for the outdoor unit.

    1. The on-site estimateWe look at the ducts, the current indoor module, the electrical panel and the planned spot for the outdoor unit.
    2. The quoteThe equipment combination, capacity and price, in writing. We check whether the combination qualifies for assistance programs.
    3. Getting readyAccess protected, old unit disconnected and removed when it is being replaced.
    4. The indoor moduleElectric furnace or air handler, with its coil, connected to the supply and return ducts.
    5. The outdoor unitOn a level base, raised above the snow, with free space all around.
    6. The refrigerant linesInsulated, they enter through a sealed opening and run to the indoor coil.
    7. Electrical and thermostatDedicated circuits, accessible disconnect, a thermostat that works with the heat pump and the backup heat.
    8. Tests and start-upLeak test, vacuum, start-up, airflow check and a test of both modes.
    9. The walkthroughFilter, thermostat, backup heat in extreme cold: what to know before winter.
    The tour

    What we check on a job like this one

    Each number is a point we check on site. Switch between summer and winter to watch air and heat move.

    Generic diagram: central heat pump, indoor module and ducts

    In summer, the outdoor unit rejects the house's heat outside.

    Generic illustration of this type of installation, not a survey of this job site. Tap a number.

    1. It captures or rejects heat outside. It sits on a level base, above the snow, with free space all around.

    2. The insulated refrigerant lines enter the house through a sealed opening and run to the indoor coil.

    3. A shut-off switch near the outdoor unit isolates it safely for service.

    4. Sitting on the indoor module, it moves heat between the house air and the refrigerant.

    5. Electric furnace or air handler: its fan pushes air through the ducts. The electric backup takes over in extreme cold.

    6. Supply ducts bring air to the rooms; returns bring it back to the unit. Their condition matters as much as the unit's.

    7. It protects the coil and the fan. A dirty filter cuts airflow, so it gets checked regularly.

    8. It runs the heat pump and the backup heat. It must be compatible with the installed system.

    At your place

    Is your home ready?

    Check what applies at your place. A "no" is not a refusal: it is what we sort out during the estimate.

    0 / 6 checked
    Maintenance

    Good habits, once the unit is in place

    Six simple habits that keep the unit going. Your list stays on this device.

    0 / 6 checked
    Through the seasons

    What to do, season by season

    Three habits per season for this unit. They take a few minutes and prevent many calls.

    • Check the indoor module's filter.
    • Clear winter debris from the outdoor unit.
    • Test cooling before the heat arrives.
    For your project

    The right pages, at the right time

    True or false

    Four statements: true or false?

    It all comes down to details you have just seen.

    1. A central heat pump uses the house's ducts.

    2. In extreme cold, electric backup heat can take over.

    3. The filter only gets changed when the unit breaks down.

    4. You can reuse the old unit's size without checking.

    Frequently asked questions

    What people ask us about this kind of work

    11 questions
    Can I keep my current ducts?
    Often, yes: the central heat pump connects to the existing ducts. We check their condition and size during the estimate.
    What happens in extreme cold?
    The indoor module (furnace or air handler) works with the central heat pump and takes over in extreme cold.
    Furnace, air handler, ducted: what is the difference?
    The furnace or air handler is the indoor module of the central system. A ducted system hides in the ceiling: all you see are small supply grilles.
    Are there grants?
    Depending on the equipment and your situation, assistance programs may apply. AirGreen checks the exact combination before quoting an amount. See the grants.
    Do I need a permit?
    Rules vary from city to city. See permits and by-laws, and we check for your address.
    How much can I save?
    Hydro-Québec says a heat pump can be up to three times more efficient than baseboards for heating in the colder months. The result depends on the house, the climate and how it is used.
    How is the LogisVert assistance calculated?
    For ENERGY STAR cold-climate certified heat pumps, Hydro-Québec lists assistance of $120 per 1,000 BTU/h of heating capacity at −8 °C. AirGreen checks the exact model before quoting an amount; only Hydro-Québec confirms the assistance granted. See the grants.
    Will my current thermostat work?
    Not always: the thermostat has to run the heat pump and the backup heat. We check compatibility during the estimate.
    Central or wall units: which one?
    If the house has ducts in good shape, a central system heats and cools every room at once. Without ducts, wall units or a multi-zone are often simpler. We compare on site.
    Does AirGreen hold the required licences?
    Yes. AirGreen holds RBQ licence 5645-9605-01, subclasses 15.8 Ventilation, 15.10 Refrigeration and 16 Electricity.
    Is the estimate free?
    Yes. The on-site estimate is free and the quote follows within 24 hours. Book my free estimate.

    Could this job help a neighbour?

    Share
    Similar projects

    More jobs to see, near you

    By town, by equipment or by region: browse more than 4,700 published projects.

    Each dot: a town where AirGreen has published projects. The glowing dot: this job.

    All our projects

    Your project

    An on-site estimate, the right capacity, the right equipment.

    The on-site estimate is free and the quote follows within 24 hours.

    • RBQ licence5645-9605-01 · 15.8, 15.10, 16
    • EstimateOn site, free
    • QuoteWithin 24 hours

    Text and photo: a real AirGreen Climatisation & Chauffage job. The diagrams are generic illustrations of the type of installation, not a survey of this job site. Sources of the added figures: airgreen.ca product pages (NEEP / AHRI performance), Hydro-Québec (Heat pumps page, LogisVert, read on 13 October 2026), Régie de l’énergie (rate D as of 1 April 2026).

    Leave a comment