Installation d’une thermopompe centrale MIDEA EVOX G3 à Pierrefonds-Roxboro, dans l’Ouest-de-l’Île de Montréal
Reading time: 15'

Installation of a MIDEA EVOX G3 central heat pump in Pierrefonds-Roxboro, in Montreal's West Island

A compact installation in a narrow side passage, with wall brackets and carefully considered clearances

At Pierrefonds-Roxboro, this installation of a MIDEA EVOX G3 central heat pump perfectly illustrates a type of project we often encounter in the West Island of Montreal: an existing property where the available outdoor space is relatively limited, with a fence, vegetation, a cladding wall and several existing constraints.

In the photo, the MIDEA outdoor unit is installed on metal wall brackets, high enough above the ground to clear the base of the unit. On the left, a chain-link fence and vegetation reduce the available width. On the right, the refrigerant lines, wiring and connections enter the building directly.

The challenge was therefore not simply to find a place to position the heat pump.

We needed to create an installation that would allow:

  • good airflow around the unit;
  • future access to the service panels;
  • sufficient height for Quebec winters;
  • a relatively short refrigerant line route;
  • a clean integration near the building;
  • and logical use of the property's side passage.

At AirGreen, this is precisely the type of situation that demonstrates why the positioning of a central heat pump deserves as much attention as the choice of the model itself.

Why wall brackets are particularly relevant for this project

The outdoor unit does not rest directly on the ground.

We used a support structure attached to the building that keeps the heat pump above the ground. This configuration is particularly useful in an area where the ground can accumulate snow, ice, leaves or other debris.

In heating mode, a heat pump must periodically perform a defrost cycle. Water is then discharged beneath the unit and may freeze when the outdoor temperature is below zero.

If a unit is installed too low, ice can gradually accumulate beneath the base.

By raising it, we create more clearance for:

  • defrost drainage;
  • snow accumulation;
  • ground cleaning;
  • visual inspection under the unit;
  • and future maintenance.

At Pierrefonds-Roxboro, where winters regularly bring snow, thawing and refreezing, this height is a true technical decision.

A unit with a horizontal discharge that must remain completely unobstructed

The MIDEA EVOX G3 uses an outdoor unit with horizontal discharge, featuring a large front fan.

The manufacturer explains that this architecture combines a horizontal fan with a high-efficiency vertical heat exchanger to promote more uniform airflow across the heat exchanger's surface and support performance as the temperature drops.

In a relatively narrow passage like the one visible on this property, this feature becomes very important.

The large fan must be able to discharge air without immediately encountering an obstacle.

The fence and vegetation visible on the left are therefore elements we must consider when positioning the unit.

After installation, we recommend that the owner keep branches and shrubs trimmed enough so that they do not press against the coil or obstruct airflow.

A heat pump does not need to be isolated in the middle of a large property, but it does need space to breathe.

An installation close to the building, but not positioned at random

The outdoor unit is installed near the wall, allowing the passageway to remain as open as possible.

This type of placement also reduces the outdoor length of the refrigerant lines.

A more direct route generally makes finishing easier and limits the number of visible changes in direction on the facade.

But placing the unit near the building does not mean pushing it against the wall without careful consideration.

We must always take into account:

the clearances specified by the manufacturer, air intake, the service side, and access to the connections.

On this project, the technical section is grouped on the right side, where the lines quickly reach the building.

The service side must remain accessible throughout the system's entire lifespan

This detail is often overlooked.

A heat pump can operate for years without major intervention, but when diagnostics or maintenance are required, the technician must be able to access the valves, panels, and electrical components.

A unit installed too close to a fence or wedged between two structures becomes much more difficult to service.

We therefore consider the project as if we had to return several years later with our tools.

This logic is an integral part of a good HVAC installation.

The climate in Pierrefonds-Roxboro demands more than good summer performance

In Montreal's West Island, a central heat pump must be chosen for both its heating and cooling performance.

MIDEA presents the EVOX G3 Extreme Heat range as capable of continuous operation down to -30 °C. The documentation also indicates up to 100% heating capacity at -25 °C, with a COP of up to 1.9 under the conditions presented by the manufacturer.

However, these figures must be interpreted correctly.

A heat pump that continues operating at -30 °C does not necessarily produce the same capacity at -30 °C as it does at 0 °C.

Actual efficiency varies according to:

  • tonnage;
  • indoor-outdoor combination;
  • building load;
  • temperature;
  • and airflow.

This is why we avoid presenting the figure “-30 °C” as sufficient data on its own.

The technology used to maintain performance at low temperatures

MIDEA explains that when the system operates in extreme cold conditions, its compressor uses a refrigeration strategy designed to increase the amount of compressed refrigerant and support heat production.

The manufacturer also presents test results for a 3-ton system: up to 2.4 COP at approximately -15 °C and, at around -25 °C, up to 118% of the nominal heating capacity with a COP of 1.92 for the tested system. MIDEA specifies that these results concern a 3-ton system.

This clarification is important.

We do not take a 3-ton rating and automatically apply it to all EVOX G3 configurations.

What capacity was installed here?

The photo clearly shows a unit from the MIDEA EVOX G3 family, but the exact model number is not legible enough for us to honestly state the tonnage of this installation.

We therefore prefer not to make up the data.

The EVOX G3 documentation lists several cooling capacities, including 18,000, 24,000, 30,000, 36,000, 48,000, and 54,000 BTU/h, depending on the pairing.

The correct choice is not based solely on square footage.

For a home in Pierrefonds-Roxboro, we must also consider the insulation, windows, orientation, number of floors, airtightness, ductwork, and actual heating requirements.

Different efficiencies depending on the model

MIDEA announces performance for the EVOX G3 range of up to 19 SEER2, 12.5 EER2, and 10.8 HSPF2, as well as a COP of up to 2.14 at 5 °F, or approximately -15 °C, depending on the applicable pairing.

The technical data sheet clearly shows that these figures change from one capacity to another.

These include:

  • an 18,000 BTU/h configuration at 19 SEER2;
  • a 24,000 BTU/h configuration at 18.6 SEER2;
  • a 30,000 BTU/h configuration at 17.2 SEER2;
  • a 36,000 BTU/h configuration at 17.7 SEER2;
  • a 48,000 BTU/h configuration at 17.5 SEER2.

This demonstrates why two quotes that simply list “EVOX G3” are not necessarily equivalent.

A central heat pump is only truly effective when the duct network and indoor unit are properly matched.

The role of airflow in an existing home

The outdoor unit visible in the photo naturally draws attention, but the more important half of the system is indoors.

A central heat pump heats and cools the home through an air handler connected to the duct network.

If the duct network is too restrictive, the return air is too small, or the filter is not properly matched, overall performance may suffer.

MIDEA integrates its Computational Constant Airflow 2.0 technology into the EVOX G3, designed to adjust fan speed and power when static pressure varies.

The documentation presents scenarios of up to 1.2 in. of water column and up to 60 airflow adjustment levels.

This flexibility is particularly useful when replacing equipment in an existing home.

But it does not replace a properly designed duct network.

The M-Coil and symmetrical fan of the indoor unit

MIDEA also uses an M-Coil and a symmetrical fan in its indoor unit.

The documentation states that this architecture aims to provide more uniform air distribution through the heat exchanger, with a reduced airflow difference compared with certain conventional designs.

This detail may interest a homeowner less than the SEER2 rating, but it directly affects the quality of heat transfer inside the home.

An indoor design suited to complex renovations

The EVOX G3 range uses a modular architecture called Block N Lock.

MIDEA presents up to six installation orientations for the indoor unit: upflow, downflow, horizontal left, horizontal right, and several low-height configurations.

This is particularly useful in homes in Pierrefonds-Roxboro, Dollard-des-Ormeaux, Kirkland, Pointe-Claire, or Beaconsfield, where the existing mechanical space can impose significant constraints.

We often have to work around an existing beam, water heater, plumbing, or main duct.

A modular indoor unit sometimes allows us to work with the home's architecture instead of modifying it unnecessarily.

A platform designed to replace certain older furnaces

MIDEA states that the indoor unit of the EVOX G3 is available in widths ranging from 14.5 to 21.5 inches, depending on capacity, which corresponds to several residential furnace dimensions.

The documentation also mentions a multivoltage configuration of 115 V and 208/230 V, depending on the application.

This can simplify certain replacement projects, but it never means that a system change should be carried out without analyzing the existing distribution network.

We still need to check:

  • the sheet metal;
  • the transitions;
  • the drainage;
  • the ductwork;
  • the electrical supply;
  • the thermostat;
  • and auxiliary heating.

Auxiliary heating up to 25 kW depending on the configuration

The EVOX G3 documentation provides auxiliary heating kits at several levels, reaching up to 25 kW.

In Quebec, electric supplemental heat can be important during certain cold snaps.

However, the goal is not to operate the electric elements as soon as the outdoor temperature drops.

A proper control strategy should allow the Inverter heat pump to provide as much of the heating as possible, then bring in supplemental heat when the building load requires it.

Sizing and programming can therefore directly affect energy consumption.

485 or 24 V control depending on the project

MIDEA provides compatibility with 485 communication as well as conventional 24 V controls.

The documentation presents several scenarios combining EVOX equipment with MIDEA or third-party thermostats.

With the MIDEA communicating thermostat and the SmartHome app, programming, consumption monitoring, comfort control, and diagnostic functions may also be available.

At AirGreen, we adapt the level of control to the project rather than imposing a single solution on every customer.

MERV 13 filtration: worthwhile, but airflow must remain the priority

The platform is also compatible with 1-, 2-, or 4-inch MERV 13 filters, depending on the filtration module. MIDEA indicates that these filters can capture more dust, pollen, particles, and pet hair while helping keep the indoor coil cleaner.

A more efficient filter nevertheless creates more resistance if it is improperly sized.

We therefore still consider filtration together with static pressure and airflow.

R-454B: a new generation of refrigerant

The MIDEA EVOX G3 uses R-454B refrigerant.

MIDEA announces for this A2L refrigerant a global warming potential of 466 and indicates its use in its core EVOX lineup.

For the homeowner, this change is practically invisible in everyday life.

For our technicians, it involves procedures, tools, and practices adapted to this new generation of systems.

The easiest errors to avoid with the outdoor unit

This Pierrefonds-Roxboro installation also provides an opportunity to review a few best practices.

After installation, avoid:

  1. allow vegetation to grow against the coil;
  2. install objects directly in front of the fan;
  3. store materials under the unit;
  4. allow a snowbank to reach the base of the unit;
  5. completely enclose the space around the heat pump with a decorative structure;
  6. modify the ductwork or electrical disconnect without considering service access.

A modern heat pump needs less space than a large older central condenser, but it still needs airflow and reasonable access.

Subsidies: verify the actual pairing before announcing an amount

The technical document provided for the EVOX G3 confirms many characteristics of the product line, but it is not sufficient on its own to determine the exact amount of financial assistance applicable to this installation.

For a subsidy application in Quebec, you need to know the exact indoor unit model, the exact outdoor unit model and the certified pairing.

Only from this precise combination can eligibility or an amount be properly verified.

We always prefer to work this way rather than present financial assistance simply because a quote mentions “MIDEA EVOX G3.”

Why this project reflects our approach at AirGreen

This MIDEA EVOX G3 central heat pump installation in Pierrefonds-Roxboro looks compact and relatively simple in the photo.

In reality, it results from several technical choices.

The unit had to be high enough for winter, accessible enough for servicing and sufficiently clear despite the presence of a fence and vegetation. The front fan had to remain unobstructed. The connections had to reach the building directly without creating an unnecessarily complex outdoor route.

And indoors, the unit still had to be properly matched with the ductwork, filtration, thermostat and auxiliary heating.

It is this combination of equipment, building and installation that determines the final quality of an HVAC system.

At AirGreen, we install MIDEA central heat pumps in Pierrefonds-Roxboro and throughout the West Island of Montreal, including Dollard-des-Ormeaux, Kirkland, Pointe-Claire, Beaconsfield and Dorval, as well as in Montreal, Laval, Longueuil, on the South Shore and the North Shore.

For a furnace replacement, a conversion to a central Inverter heat pump, or an upgrade to an existing system, we always assess the complete installation rather than limiting ourselves to the outdoor unit.

Leave a comment