A disconnect switch, a sheet of ice forming on the interlocking-paver driveway, and a vinyl wall that supports nothing: our GREE FLEXX R32 ULTRA 34,000 BTU central heat pump installation in Massueville, explained from the electrical load calculation to the AHRI number.

Take a tour of the installation
Each number is a point we check on site. Switch between summer and winter to watch air and heat move.
In summer, the outdoor unit rejects the house's heat outside.
Generic illustration of this type of installation, not a survey of this job site. Tap a number.
It captures or rejects heat outside. It sits on a level base, above the snow, with free space all around.
The insulated refrigerant lines enter the house through a sealed opening and run to the indoor coil.
A shut-off switch near the outdoor unit isolates it safely for service.
Sitting on the indoor module, it moves heat between the house air and the refrigerant.
Electric furnace or air handler: its fan pushes air through the ducts. The electric backup takes over in extreme cold.
Supply ducts bring air to the rooms; returns bring it back to the unit. Their condition matters as much as the unit's.
It protects the coil and the fan. A dirty filter cuts airflow, so it gets checked regularly.
It runs the heat pump and the backup heat. It must be compatible with the installed system.
The disconnect switch, interlocking pavers, and vinyl siding: three details that no one photographs, yet that determine a central heat pump's service life
When a homeowner sends us a photo of an installation completed by another contractor and asks for our opinion, we almost never look at the unit first. We look at what surrounds it: the gray box mounted on the wall beside it, the ground beneath the unit, and the way the siding was penetrated. These three elements are what separate an installation that lasts twenty years from one that causes problems in its third year.
The Massueville project is a good example of how we address these three points on a GREE FLEXX R32 ULTRA central heat pump.
Massueville: a village center, not a suburban development
Massueville, in the MRC de Pierre-De Saurel, is a village of a few hundred residents south of Sorel-Tracy, organized around an historic core. The housing stock is made up mainly of older homes, often expanded over the decades, with siding replaced once or twice and foundations that are not always level.
Two local realities affect a central heat pump project in this area:
- No natural gas network. Heating is provided by electricity, oil, propane, or wood.
- Sensitivity to the appearance of façades. In several village centers in Montérégie, the installation of mechanical equipment visible from the street is governed by municipal regulations. We check the applicable zoning bylaw before choosing the location—not after drilling through the wall.
Here, the outdoor unit was installed on a side wall, out of view from the public road, on an area already finished with interlocking pavers.
The electrical side: what the gray box next to the unit really means
In the photo of this installation, a gray enclosure mounted on the wall to the right of the unit can be seen, connected by watertight flexible conduit. It is a disconnect—a local disconnecting device—and probably the component most often botched, or even completely omitted, on the residential installations we are called in to correct.
Why it must be there
The Code requires a disconnecting means within sight of the equipment and in the immediate vicinity. The rationale is not administrative: a technician opening the electrical compartment of an outdoor unit must be able to disconnect the power themselves, see that it is off, and know that no one will restore power while their hands are inside. A circuit breaker in the basement, behind a door, in a panel that someone could reset without realizing it, does not fulfill this function.
Three common mistakes in this regard:
- The disconnect mounted on the unit’s service panel. It becomes impossible to remove the panel without dismantling the disconnect.
- The disconnect installed behind the unit. Technically present, but practically inaccessible.
- An enclosure not designed for outdoor use. Two winters later, the interior is corroded and the contacts overheat.
MCA 27.7 A and MOCP 30 A: what these two figures require
The outdoor unit GUD36W2/NhE-D(U) is powered at 208-230 V, with an MCA of 27.7 A and an MOCP of 30 A.
- The MCA (minimum circuit ampacity) dictates the minimum conductor rating. Below that, the cable overheats.
- The MOCP (maximum overcurrent protection) dictates the maximum circuit-breaker rating. Above that, the protection no longer protects much.
In other words: the circuit must be dedicated, sized for at least 27.7 A, and protected by a circuit breaker rated at no more than 30 A. Installing a 40 A breaker “to be safe” because the unit trips on startup is a dangerous response to a problem with another cause. The indoor section has its own requirements (MCA 5.3 A, MOCP 15 A) and its own circuit.
The connection itself
The watertight flexible conduit between the disconnect and the unit is not decorative: it absorbs the equipment’s micromovements and prevents vibration from being transmitted to the enclosure and connections. It must descend in a low loop before rising toward the unit’s entry point, so water running along the conduit drips off at the low point instead of entering the electrical compartment.
Panel capacity: check it before ordering
In an electrically heated village home with a water heater, stove, dryer, and sometimes a sump pump, adding two circuits—one of them 30 A—is not always possible on an existing panel. We perform the load calculation before ordering the equipment, never on the morning of the installation.
The interlocking pavers beneath the unit: January's trap
The unit is installed above a surface of interlocking pavers, which largely explains the choice to mount it on wall brackets rather than on a ground pad: no one wanted to cut into the landscaping.
This choice solves one problem and creates another, which must be addressed.
In heating mode, a heat pump produces water. The defrost cycle melts the frost that has accumulated on the outdoor coil, and this water drips down. On gravel, it soaks in. On interlocking pavers, in January, it freezes and gradually forms a sheet of ice. If this surface is a walkway—to the yard, the shed, or the recycling bin—the problem is no longer mechanical; it is human.
Our options, depending on the site:
- A strip of clean stone removed from the paving beneath the unit so the water can soak in instead of spreading.
- A drain pan with a discharge line directed away from traffic areas.
- A shift of a few dozen centimeters for the unit, where the layout allows, to move the dripping water out of the walkway.
We discuss this with the client when preparing the quote. A contractor who never addresses defrost water has probably never received a callback in February.
Installing against vinyl siding
The wall has vinyl siding, and that detail changes the method.
Vinyl is a flexible siding material, installed deliberately with room to float and absorb thermal expansion—a panel can move several millimeters between January and July. It provides no load-bearing capacity and cannot tolerate being compressed: a screw tightened fully into vinyl deforms it, cracks the panel in cold weather, and creates a path for water behind the siding.
The brackets were therefore anchored in the parged concrete foundation, beneath the vinyl siding, using hardware suitable for concrete. Anti-vibration pads are placed between the unit's feet and the support arms, and the bolts are tightened without crushing the pads—a pad compressed solid no longer does its job and transmits vibration into the wall, and therefore into the house.
Where the refrigerant line and wiring pass through the siding, the penetration is made with a sleeve and a slope toward the outside, then sealed with a product compatible with vinyl. Caulk applied directly to a moving vinyl joint peels off within a season.
The A2L R32 label on the side of the appliance
The mildly flammable refrigerant pictogram and the wording A2L R32 are visible on the unit's electrical box. This is not a warning to ignore, nor is it a reason for concern.
What this means in practice:
- Refrigerant repair and handling are reserved for personnel trained in A2L refrigerants, using compatible tools, vacuum pumps, and detectors. This is written on the label itself.
- The room's charge and ventilation matter for the indoor section, not the outdoor unit. A coil or fan coil installed in a cramped room is subject to different rules than the same appliance in an open basement.
- The A2L leak detection sensor is factory-installed on the FLEXX ULTRA range. It still needs to be connected and checked during commissioning, as documented on our checklist.
- Never drill into a component containing refrigerant, including to “run a wire through.”
A contractor who handles an R32 system exactly as they handled R410A five years ago has not updated their methods. This is a question to ask before signing, whether in Massueville, Montréal, Laval, Longueuil, or anywhere on the North Shore and South Shore.
The installed combination
| Data | GUD36W2/NhE-D(U) + GUD36AH2/G-D(U) |
|---|---|
| Rated cooling capacity | 34,000 BTU/h (modulation 18,000–37,000) |
| Rated heating capacity | 34,000 BTU/h (modulation 18,000–37,000) |
| SEER2 | 18 |
| HSPF2 | 10 |
| EER2 | 12 |
| COP | 3,2 |
| AHRI number | 217120760 |
| ENERGY STAR | Yes |
| Heating range | -30 °C to 24 °C |
| Cooling range | -15 °C to 54 °C |
| Outdoor — power supply | 208-230 V, MCA 27.7 A / MOCP 30 A |
| Indoor — power supply | MCA 5.3 A / MOCP 15 A |
| Outdoor — dimensions and weight | 990 x 960 x 370 mm, 187.5 lb (85 kg) |
| Indoor — dimensions and weight | 540 x 1224 x 540 mm, 163.1 lb (74 kg) |
| Sound level | 61 dB(A) |
| Refrigerant | R32 (A2L), 2.9 lb, detection sensor included |
| Piping | 3/8-in. liquid line, 3/4-in. gas line — max. 98.4 ft (30 m), max. elevation difference 49.2 ft (15 m) |
| Control | Conventional 24 VAC thermostat, factory-installed Wi-Fi |
| Warranty | 10 years + 2 years on the compressor and parts with registration |
Capacity, rebates, and maintenance: the decisions that follow installation
Why 34,000 BTU and not 48,000
The FLEXX ULTRA series goes up to 54,000 BTU. It would have been easy to propose a larger unit. We do not do so without good reason, and here is why.
An oversized unit reaches its setpoint too quickly, shuts off, restarts, and spends its life operating in the ranges where its efficiency is lowest. In summer, short cycles mean insufficient dehumidification: the house is cold and muggy rather than cool and dry. In winter, modulation loses its benefit because the unit operates constantly at the bottom of its range.
The selected combination modulates from 18,000 to 37,000 BTU/h. This range—not the nominal capacity—determines actual comfort. It was selected after a load calculation, not based on square footage, a method that almost systematically oversizes renovated homes.
LogisVert: the AHRI number is the key document in the application
Hydro-Québec's LogisVert program determines the rebate for an air-source heat pump based on its heating capacity at -8 °C, using a scale of approximately $120 per 1,000 BTU/h, with a maximum of around $6,700. It also provides enhanced amounts when the installation replaces oil or propane heating—a common situation in the Pierre-De Saurel RCM.
The requirements: be a residential property owner and an Hydro-Québec customer, have the work carried out by a contractor holding a RBQ licence, and install an approved, ENERGY STAR certified system bearing a valid AHRI number.
This last point deserves clarification. An AHRI number does not certify an individual unit: it certifies a specific combination of an outdoor unit and an indoor section. 217120760 corresponds exactly to the combination installed here. Changing the indoor section to an “equivalent” model from another product line, even from the same brand, invalidates the number and may result in a perfectly legitimate application being denied on technical grounds.
Since the rates are revised periodically, we confirm the amount applicable to the file before including it in a quote.
The maintenance, and the fact that the unit is now accessible
Mounting the unit on wall brackets above the paving has an advantage the customer had not anticipated: the unit remains accessible year-round, at working height, without having to clear a metre of snow before opening a panel.
The annual HVAC maintenance program we recommend for a central heat pump includes cleaning the outdoor coil, checking the charge and pressures, inspecting the electrical connections and tightening at the disconnect switch, inspecting the indoor-section condensate drain, checking the A2L sensor's operation, and replacing the filter. An outdoor coil clogged with pollen and maple seeds can lose several percentage points of efficiency in a single season—and in a village area surrounded by fields, buildup occurs faster than in the city.
Our coverage in Montérégie and Greater Montreal
At AirGreen, we install and maintain central heat pumps, ductless mini-split heat pumps, central air-conditioning systems, and heating equipment throughout Greater Montreal and the Montérégie region, including the Sorel-Tracy area, the RMC of Pierre-De Saurel, Saint-Hyacinthe, as well as Longueuil, Boucherville, Châteauguay, and Saint-Constant. We also serve Montreal, Laval, the North Shore, and the South Shore.
If you are considering a central heat pump and want a quote in which the electrical work, defrost-water drainage, and anchoring are costed and explained rather than left unmentioned, we come to your property, take measurements, and put every element in writing.
The big day, step by step
The main steps of this kind of job at AirGreen. Every house has its quirks: the estimate brings them out.
We look at the ducts, the current indoor module, the electrical panel and the planned spot for the outdoor unit.
The equipment combination, capacity and price, in writing. We check whether the combination qualifies for assistance programs.
Access protected, old unit disconnected and removed when it is being replaced.
Electric furnace or air handler, with its coil, connected to the supply and return ducts.
On a level base, raised above the snow, with free space all around.
Insulated, they enter through a sealed opening and run to the indoor coil.
Dedicated circuits, accessible disconnect, a thermostat that works with the heat pump and the backup heat.
Leak test, vacuum, start-up, airflow check and a test of both modes.
Filter, thermostat, backup heat in extreme cold: what to know before winter.
- The on-site estimateWe look at the ducts, the current indoor module, the electrical panel and the planned spot for the outdoor unit.
- The quoteThe equipment combination, capacity and price, in writing. We check whether the combination qualifies for assistance programs.
- Getting readyAccess protected, old unit disconnected and removed when it is being replaced.
- The indoor moduleElectric furnace or air handler, with its coil, connected to the supply and return ducts.
- The outdoor unitOn a level base, raised above the snow, with free space all around.
- The refrigerant linesInsulated, they enter through a sealed opening and run to the indoor coil.
- Electrical and thermostatDedicated circuits, accessible disconnect, a thermostat that works with the heat pump and the backup heat.
- Tests and start-upLeak test, vacuum, start-up, airflow check and a test of both modes.
- The walkthroughFilter, thermostat, backup heat in extreme cold: what to know before winter.
What would it look like at your place?
Two quick checks with real numbers: what heat costs, and what your current heaters add up to in BTU/h.
Conversion: 1 W = 3.412 BTU/h. An indication, not a load calculation: baseboards and furnaces are often stronger than the real need, and they can stay as backup. AirGreen confirms the capacity on site.
Four mistakes we do not make
Flip each card to see what we do instead.
Your own project, step by step
What to do, season by season
Three habits per season for this unit. They take a few minutes and prevent many calls.
- Check the indoor module's filter.
- Clear winter debris from the outdoor unit.
- Test cooling before the heat arrives.
- Check the filter more often in peak season.
- Keep registers and returns clear.
- Watch condensate drainage near the coil.
- Change or clean the filter.
- Test heating and backup heat before the cold.
- Book periodic maintenance.
- Clear snow around the outdoor unit.
- Store nothing in front of the indoor module.
- Note any unusual noise or smell and call us.
Is your home ready?
Check what applies at your place. A "no" is not a refusal: it is what we sort out during the estimate.
Four statements: true or false?
It all comes down to details you have just seen.
1. A central heat pump uses the house's ducts.
It connects to the existing ducts to heat and cool everywhere.
2. In extreme cold, electric backup heat can take over.
The indoor module (furnace or air handler) works with the heat pump and takes over in extreme cold.
3. The filter only gets changed when the unit breaks down.
A dirty filter cuts airflow. It gets checked regularly.
4. You can reuse the old unit's size without checking.
The house may have changed: insulation, windows, added rooms. Capacity is confirmed on site.
0 / 4 right answers
What people ask us about this kind of work
Can I keep my current ducts?
What happens in extreme cold?
Furnace, air handler, ducted: what is the difference?
Are there grants?
Do I need a permit?
How much can I save?
How is the LogisVert assistance calculated?
Will my current thermostat work?
Central or wall units: which one?
Does AirGreen hold the required licences?
Is the estimate free?
No question matches. Write to us: we answer.
More jobs to see, near you
By town, by equipment or by region: browse more than 4,700 published projects.
Each dot: a town where AirGreen has published projects. The glowing dot: this job.
Every house has its constraints. We see them before we install.
The on-site estimate is free and the quote follows within 24 hours.
Text and photo: a real AirGreen Climatisation & Chauffage job. The diagrams are generic illustrations of the type of installation, not a survey of this job site. Sources of the added figures: airgreen.ca product pages (NEEP / AHRI performance), Hydro-Québec (Heat pumps page, LogisVert, read on 13 October 2026), Régie de l’énergie (rate D as of 1 April 2026).