Installation of a GREE FreeMatch R32 2-head wall-mounted heat pump (GWHD(24)ND6MO) on a rooftop in Dollard-des-Ormeaux, in Montreal’s West Island

First rooftop installation from our GREE FreeMatch R32 series: in Dollard-des-Ormeaux, a two-head heat pump mounted on a ballasted frame beside a terrace. Why we never puncture a membrane, and how the parapet changes things.

By AirGreen Climatisation & Chauffage Admin30 min read
Installation of a GREE FreeMatch R32 2-head wall-mounted heat pump (GWHD(24)ND6MO) on a rooftop in Dollard-des-Ormeaux, in Montreal’s West Island
Installation of a GREE FreeMatch R32 2-head wall-mounted heat pump (GWHD(24)ND6MO) on a rooftop in Dollard-des-Ormeaux, in Montreal’s West Island
–chapters in this story
30 minreading time
–type of installation
2026year published
The tour

Take a tour of the installation

Each number is a point we check on site. Switch between summer and winter to watch air and heat move.

Generic diagram: wall-mounted heat pump, indoor and outdoor units

In summer, the outdoor unit rejects the house's heat outside.

Generic illustration of this type of installation, not a survey of this job site. Tap a number.

  1. Mounted level on a wall plate, high enough for the air to reach the whole room, with enough space around it to slide the filters out easily.

  2. The refrigerant lines, the communication cable and the drain go through the wall in a single opening, sealed against water, cold air and insects.

  3. Two insulated copper pipes connect the two units. Outside, a line cover can protect them from sun, knocks and weather.

  4. A shut-off switch near the outdoor unit isolates it safely for service. It must stay accessible at all times.

  5. The compressor and the fan. In heating mode it captures heat from the outdoor air, even in winter, and moves it inside.

  6. On the ground or on the wall, it keeps the unit above accumulated snow. The unit stays clear and defrost water can drain away.

  7. The fan needs to blow freely. Storage, a fence or a wall too close, and efficiency drops while noise goes up.

The job

Installing an outdoor unit on a flat roof: everything is decided before the first sleeper touches the membrane

Of the thirty-eight GREE FreeMatch R32 projects we documented this year, the outdoor unit was installed on the ground on a stone bed, on piles, on wall brackets, or on the balcony of a high-rise—but never on a roof. The one in Dollard-des-Ormeaux is the first, and it deserves an entire article because almost everything we know about ground-level installation stops applying as soon as the unit is moved onto a flat roof.

The project photo was taken at night, in winter, after the first snowfall: the GREE unit rests on a metal frame placed on wooden sleepers, a few centimeters above the membrane; on the right, a wooden deck with a white railing, itself mounted on supports; in the foreground, the set of black-sheathed refrigerant lines crossing the roof, passing over the brick parapet, and descending along the wall. Each of these elements reflects a decision made before the project began, and most could not have been corrected afterward.

At AirGreen, we carry out HVAC installations in Montreal, Laval, Longueuil, on the North Shore, and on the South Shore. Here is how we approach a rooftop installation—and what we refuse to do.

The Dollard-des-Ormeaux project at a glance

Dollard-des-Ormeaux covers approximately 15.1 km² in the central-western part of the Island of Montreal. It has no waterfront and is completely enclosed by its neighbors in the West Island. With nearly 50,000 residents, it is the island’s most populous suburb outside Montreal, and its density—around 3,300 inhabitants per square kilometer—is very high for a low-rise residential city. The city was incorporated in 1960, and its population grew from a few hundred residents to more than fifteen thousand in a decade; most of its housing stock therefore dates from the 1960s and 1970s, along with the prevalence of flat or low-slope roofs that era left throughout the western part of the island. The city was reconstituted on January 1, 2006, after the merger period.

These two characteristics—closely spaced lots and flat roofs—alone explain why this project was installed on the roof.

Selected configuration:

  • Outdoor unit: GREE FreeMatch R32 GWHD(24)ND6MO, installed on the roof
  • Head 1: 12,000 BTU/h wall-mounted unit, open-plan living room–kitchen area on the main floor
  • Head 2: 12,000 BTU/h wall-mounted unit, primary bedroom and its reading nook upstairs
  • Installed indoor capacity: 24,000 BTU/h, or 100% of the nominal capacity
  • AHRI codes: 214931587 (non-ducted), 214931593 (ducted), 214931597 (mixed)
  • Developed lengths: approximately 16 m and 21 m, for 37 m in total
  • Height difference: approximately 7 m between the rooftop unit and the lowest head

The model selection and zone layout are discussed below, deliberately in just a few paragraphs: we developed them in detail in our recent articles on Ahuntsic-Cartierville, Baie-D'Urfé, and Beaconsfield, all three devoted to two-zone systems. Here, the roof is the story.

Why the roof instead of the ground

A rooftop installation is never the first instinct. It costs more, complicates maintenance, and adds constraints that a ground-level location does not have. We propose it only when ground-level locations fail a specific test, and in Dollard-des-Ormeaux they failed three.

  • Proximity to the neighbors. On closely spaced suburban lots, both side façades faced directly onto the bedroom windows of neighboring homes. We covered the interpretation of a published sound level and municipal siting regulations in detail in our Huntingdon article; suffice it to say here that the most convenient location for the installer is rarely the one that protects the neighborly relationship.
  • Snow-clearing corridor. A garage entrance cleared by snowblower every winter is no place for a 51 kg unit, and the accumulation along the edge of the driveway is exactly where one would be tempted to put it.
  • Route length. The two rooms served are at the back of the house; a ground-level location at the side façade would have made the ducts run around the entire building.

The rear flat roof, already occupied by a terrace, offered direct access to both rooms and significantly greater distance from the neighbors. It is a good location—provided you know what you are doing with a membrane.

The rule that governs everything else: you do not puncture a membrane

A flat roof is not a slab. It is a watertight assembly whose performance depends on the continuity of a membrane, and that continuity is the only thing preventing water from entering the structure. Our position on this point allows no exceptions: we do not puncture a roof membrane to anchor an air-conditioning unit.

Three reasons, in that order.

  1. A poorly executed penetration does not leak right away. It leaks three winters later, the water travels through the insulation, and the damage appears far from the entry point. No one then connects it to the heat pump.
  2. The roof warranty belongs to the roofer, not us. A penetration made by a third party is generally enough to compromise it. When a penetration is genuinely unavoidable, it is made and flashed by the roofer, with documentation on file—not improvised by the HVAC team on a Friday afternoon.
  3. Mechanical anchoring on a roof accomplishes almost nothing. The weight of the appliance and its frame, properly distributed, is enough to hold it in place; what anchoring really addresses is a concern, not a force.

The solution is therefore ballasted: the appliance rests on a frame, which in turn rests on sleepers, which rest on the membrane, with a protective interface between the wood and the waterproofing.

The frame on sleepers, and why it is always wider than the appliance

In the photo, you can make out the unit's metal frame, its adjustable feet, and the wooden pieces laid flat underneath the assembly. This is not improvisation; it is the answer to a simple calculation: the four feet of a 51 kg appliance concentrate the entire load on four points measuring only a few square centimetres each. On a membrane, four load points mean four wear points—made worse by freeze-thaw cycles, thermal movement of the membrane, and compressor vibration.

Our method:

  • Distribute the load before fastening. The sleepers are sized to distribute the load over an area significantly larger than the appliance's footprint and oriented perpendicular to the load-bearing structure rather than placed arbitrarily.
  • Protect the interface. Use an abrasion barrier between the wood and the membrane, because the wood moves, absorbs moisture, and rubs against it.
  • Raise it properly. The underside of the appliance must remain above accumulated snow and standing water, which is a more demanding requirement on a roof than on the ground.
  • Keep everything out of the water-flow path. The frame must not block a drainage slope, come near a roof drain, or create a dam where water can collect and freeze.
  • Ask about the roof structure. An appliance, its frame, the snow around it, and a technician crouching beside it represent a point load on a roof designed for a distributed load. On a house, this is usually inconsequential; on a long span, an older addition, or a deck added later, the question should be raised with a building professional, not an installer.

And a question we systematically ask when preparing a quote, because it affects the client’s schedule far more than the choice of equipment: how old is your roof? Installing a heat pump on a membrane with only four or five years of service life remaining means committing to paying later for removing, storing, and reinstalling the unit—with refrigerant recovery and recommissioning. When roof replacement is approaching, the right order is to redo the roof first.

Crossing the parapet

In the photo, the set of insulated lines crosses the roof, passes over the brick parapet capped with its metal flashing, and then descends again. This is the most vulnerable point of the entire installation, and the one most often done poorly.

What we check:

  • The crossing goes over the top, never through a hole drilled randomly in the parapet. If a penetration is necessary, it is referred back to the roofer with proper flashing.
  • A drip loop is provided before the crossing point, so that water running along the insulation falls to the ground rather than following the pipe inside.
  • There is no direct contact between the copper and the flashing metal on the parapet cap. The metal moves, heats up, and expands; copper resting against it wears away through abrasion for years before it develops a hole. We install a support between them.
  • The bending radius is respected at the crossing. This is where one is tempted to force the pipe to follow the angle. Crushed copper cannot be seen beneath the insulation and can never be repaired.
  • The line remains continuous and the insulation is never interrupted, including at the crossing. We explained to Saint-Étienne-de-Beauharnois and Saint-Louis-de-Gonzague what compressed or cut insulation causes in cooling mode: condensation on the suction line, where no one can see it.

Defrost water on a roof in winter

Here is the point that truly distinguishes a rooftop installation, and it is almost always absent from quotes.

In heating mode, the outdoor unit defrosts: it briefly reverses its cycle, the ice formed on its coil melts, and this water falls beneath the unit. We explained to Les Cèdres where this discharge should end up on the ground and why it must never flow onto a pedestrian walkway. On a roof, the challenge is different: the water has nowhere to seep into. It remains on the membrane, flows toward the drain, and freezes in the meantime.

Three consequences we address during the design:

  • The water’s path is established before the frame is installed, following the roof’s actual slopes rather than the plan. An appliance installed in a retention area creates its own ice sheet, which then rises into the frame.
  • The roof drain remains clear. A drain partially blocked by ice produced by the unit can turn a normal defrost cycle into water accumulation on the roof.
  • The walking surface remains safe. On a flat roof, frozen defrost water forms a walking surface, not a stain on a wall. The discharge is therefore directed away from the area where people walk.

Let us also recall the clarification we make at every commissioning, because it avoids an unnecessary service call: in winter, it is not the indoor units that produce water. Their drain pans and drains operate only in cooling mode. All visible water around the outdoor unit in January comes from defrosting, and this is normal.

Vibrations: on a roof, they travel down into the house

At ground level, a vibrating compressor transmits its low frequencies into a bed of stone, which absorbs them. On a roof, it transmits them into structural decking that is also the ceiling of an occupied room.

The correction involves three levels, and the first is free: do not place the unit above a bedroom. We review the floor plan of the top floor before choosing the location, just as we review the neighbours' windows. Next come vibration-isolation pads between the unit and its support frame, then between the frame and the sleepers—two interfaces instead of one. Finally, the lines are flexibly supported near the unit so that the piping itself does not become a transmission path. The general mechanism of structure-borne transmission in a lightweight structure is developed in our Saint-Chrysostome and Rigaud articles.

A rooftop route is always longer than you think—and that is what determined the model

At ground level, a set of lines leaves the back of the unit and passes through the wall: three metres. On the roof, it crosses the roofing to the parapet, goes over it, descends, enters the building, and then reaches each indoor unit. The 37 metres of installed length on this project are nothing exceptional: this is the normal geometry of a rooftop installation.

It was this length, and nothing else, that determined the model.

  • On the GWHD(18)ND6MO, the maximum total length is 40 m. Thirty-seven metres is 93% of the limit, leaving no margin for an unexpected routing issue. Since its pre-charged length is only 10 m, it would have been necessary to add 27 m × 20 g/m, or 540 g of R32 to a factory charge of 900 g—a 60% increase, with the obligation to redo the minimum room-area verification related to the A2L refrigerant. We published the complete arithmetic for this calculation in our Ahuntsic-Cartierville article.
  • For the GWHD(24)ND6MO, the limit is 60 m and the precharged length is 30 m. The 37 m developed length represents 62% of the limit, and the addition is limited to 7 m × 20 g/m, or 140 g on a 1,700 g charge — approximately 8%, weighed and recorded in the file.

The elevation difference, however, must be checked in the other direction: on these two models, the maximum height difference is 15 m, compared with 25 m on the higher-end models in the range. With the unit on the roof and the lowest head on the ground floor, approximately 7 m separate the two ends of the system. The margin is comfortable here, but in a multistory building, this table entry becomes a disqualifying criterion — we encountered it in Saint-Michel, on a high-rise condo, with the 25 m limit of the larger models.

One final reading note, applicable to the entire range: the cover page of the FreeMatch documentation states “maximum piping length: 100 m.” That figure applies only to the GWHD(42)ND6MO. On a two-head project, the actual limit is 40 or 60 m depending on the model, and that is the figure that matters.

The zoning itself is nothing exceptional, so we will not repeat it here: the method for selecting the two rooms is published in our Baie-D'Urfé article, the choice between the small and large model for a two-zone project in the Beaconsfield article, the interpretation of the minimum and maximum capacity lines in the Dorval article, and the question of two comparable zones in the Vaudreuil-sur-le-Lac article. Two 12,000 BTU/h heads at exactly 100% of nominal capacity, on a unit whose maximum modulated capacity reaches 31,400 BTU/h: both zones can call for heat at the same time without either being deprived, and there is nothing more to prove. The electric baseboards remain in service everywhere, set 2 to 3°C below the heads' setpoints, and the balance point is put in writing before the order is placed.

What matters in this project is not the ratio. It is that the model was chosen based on the route length, not the heat load of the two rooms — something that almost never happens at ground level and almost always happens on rooftops.

The data that support the argument

The complete technical column for the GWHD(24)ND6MO is published in our Dorval article; we do not repeat it here. These are only the lines that determine a rooftop installation.

Characteristic Value
Model GREE FreeMatch R32 GWHD(24)ND6MO
Connectable indoor units 2 to 3
Precharged length 30 m (98 ft)
Maximum total length 60 m (197 ft)
Maximum elevation difference 15 m (49 ft)
Additional charge 20 g/m (0.2 oz/ft)
Refrigerant R32, 1,700 g (60 oz)
Liquid / gas diameter 1/4 in / 3/8 in
Net weight 51 kg
Dimensions (L × H × D) 964 × 660 × 402 mm
Sound pressure (high speed) 58 dB(A)
MCA / maximum protection 19.5 A / 25 A
Heating operating range -30 to 24 °C
SEER2 / HSPF2 / EER2 21 / 10 / 12
AHRI codes 214931587 / 214931593 / 214931597

Leak detector A2L integrated, G10 inverter technology, intelligent defrost, automatic voltage adaptation, and self-diagnostics are common to the entire range.

The 51 kg deserves an extra sentence in this specific context: it is the load the structure must distribute, the weight that has to be lifted onto the roof on installation day, and the weight that will have to be brought back down if the roof is rebuilt. At ground level, nobody cares about this figure. Here, it matters three times.

A deck and a heat pump on the same roof

The other notable element in this photo is the immediate surroundings: the unit shares the roof with a wood deck mounted on pedestals, including the guardrail. This coexistence is increasingly common in the western part of the island, and it creates four situations that no one anticipates.

A solid guardrail is not a decorative fence

An openwork guardrail lets air pass through; a solid skirt, windbreak panel, or taut tarp does not. The unit draws air in through its rear and side faces and discharges it through the front.

The thermodynamic mechanism—the discharged air returning to the intake, condensing pressure rising in cooling mode, defrost cycles multiplying in heating mode, and no alarm to signal it—is explained in our Ahuntsic-Cartierville article. What is specific to a rooftop terrace is that the obstruction changes with the seasons: a windbreak panel installed in June, a winter cover stretched in November, a bench moved, or packed snow pressed against a skirt. A clearance approved in August is no longer adequate in January.

The rule given to the customer fits in one line: nothing is to be added around the unit without asking us, and the roof is not a storage area—not for off-season patio furniture or flower boxes. And never use a full cover on the unit: a heat pump operates in winter, and a closed tarp traps moisture and prevents defrost water from drying.

The noise changes character when the listener is three meters away

All the usual discussion about decibels assumes a distant listener, usually the neighbor. On a rooftop terrace, the closest listener is you, sitting a few meters away, at the same height as the unit, with nothing between you and it—and often in the evening after a hot day, precisely when the unit is working hardest.

The 58 dB(A) published for this model is measured without a specified distance, which we discussed in detail in our Huntingdon article. What matters here is simpler: on a terrace, every metre gained between the unit and the seating area is worth more than any setting. Our three practical measures:

  • Move it away and orient it. The unit is placed at the end of the roof farthest from the dining area, with its discharge directed toward open space rather than the seats—the airflow is also uncomfortable in itself, not just noisy.
  • Activate silent mode during commissioning. Most of these units have a night or sound-reduction function that remains disabled from the factory and that almost no one activates. Check the manual for the delivered model.
  • Decouple the unit from the decking. Vibration transmitted through a wooden structure reaches the decking beneath the guests' feet. Anti-vibration pads are not only for the rooms below.

Snow on a roof does not behave like snow on the ground

On the ground, snow settles and melts from below. On a roof surrounded by a parapet and cluttered with a terrace, it accumulates in drifts against obstacles—and the unit is an obstacle.

We derive four requirements from this, applied to this project:

  1. Generous elevation of the bottom of the unit, calculated based on actual accumulation rather than a standard height.
  2. Orientation of the intake face away from the direction where snow accumulates most, assessed on site and confirmed with the owners, who know their roof better than we do.
  3. Disconnect switch and junction box above the snow line. A buried disconnect switch is not a disconnect switch.
  4. No shoveling around the unit. A shovel on a membrane causes a tear; a shovel against a coil bends the fins and causes permanent capacity loss, with no error code to warn you. Clearing is done by hand or with a broom, and it is part of the written instructions provided to the customer.

Exposed insulation: a detail that comes at a cost within five years

On a rooftop run, the piping is exposed to full sun all year round, with no shade from a wall or hedge. This is a situation our ground-level projects almost never encounter, and it has one specific consequence: bare elastomeric insulation deteriorates under ultraviolet light. It hardens, cracks, and then crumbles—first on the exposed side, invisible from the ground.

What follows is mechanical. Cracked insulation stops insulating; the cold suction line condenses during cooling; water runs along the pipe to the lowest point, very often where it passes through the parapet; and the damage appears years later with no apparent connection to the unit. All of this is accompanied by a loss of efficiency that triggers no alarm.

Our standard for an exposed run: continuous sheathing or protective coating along the entire exterior length, sealed joints, and restored coating at critical points—parapet crossings, changes in direction, and entry into the building. In the photo, the continuous black sheath extending to the parapet meets this requirement. It is also one of the few parts of the installation that can be visually inspected in thirty seconds during the annual visit.

One related point, specific to a long exposed run: copper expands and contracts with temperature differences, and a long, straight run rigidly secured at both ends puts stress on its fittings. Changes in direction and spacing between supports absorb this movement; this is design, not finishing work.

Going up, then coming back down: service access in February

In Saint-Lazare, we documented how height changes the installation process and why an inaccessible head is one that is never maintained. A rooftop outdoor unit raises the same question, with one additional variable: the season.

A heat pump needs servicing when it breaks down, which often means in January, at −18 °C, on a membrane roof covered with packed snow, next to a parapet. What we establish before signing:

  • How we get up there. An access hatch, a terrace staircase, a secured ladder—not a ladder leaning against a snow-covered parapet. Fall-protection measures required in Quebec beyond a certain working height apply to the service technician just as they do to the installer, and they must be planned before an emergency occurs.
  • How we get the equipment up. Fifty-one kilograms, plus the frame, plus the window frames, plus the tools: the lifting logistics are included in the quote, and they explain part of the price difference between a ground-level installation and a rooftop installation. We prefer to explain this rather than bury it in a total.
  • What you see before climbing up. Part of the diagnosis can be done from inside, using the unit’s self-diagnostic feature—the error code can be read and photographed before bringing out the ladder. Our remote triage method is detailed in our Saint-Bernard-de-Lacolle article.
  • What is photographed on the first day. Nameplate, A2L labels, serial number of the outdoor unit and both heads, and the condition of the membrane beneath and around the support frame. Four years later, these photos are worth an entire service visit.

Mistakes to avoid with a rooftop installation

  1. Pierce the membrane to anchor the unit. This is the most expensive mistake and the one that takes the longest to reveal itself.
  2. Place the unit directly on the membrane, without a support frame or sleepers, assuming that four rubber pads will suffice.
  3. Install on a roof nearing the end of its service life without first considering whether it should be replaced.
  4. Block the flow of water or move close to a roof drain.
  5. Treat the parapet as merely an obstacle to cross rather than as the most vulnerable point along the route.
  6. Leave exposed insulation uncovered in the sun along its entire exposed length.
  7. Place the unit above a bedroom because it is the most unobstructed part of the roof.
  8. Add a windbreak, tarp, or furniture around the unit after the fact.
  9. Shovel snow around the unit or onto the coil.
  10. Fail to plan for winter access before the first breakdown.
  11. Have it installed by an unlicensed contractor, which complicates both the manufacturer's warranty and any subsequent insurance claim.

HVAC maintenance: what a rooftop installation adds to the schedule

The maintenance schedule for a dual-zone system remains modest, but two items are added when the unit is on a roof:

  • Rinse the indoor filters every 4 to 8 weeks during intensive use, depending on room usage, and clean the outdoor coil annually. A dirty coil triggers no error code: capacity is lost without warning.
  • Visual inspection of the exposed route at every annual visit: condition of the line set, parapet crossing, supports, and seals.
  • Inspecting the interface with the membrane: deformation, shifting of a frame, signs of wear, and debris buildup beneath the support frame. Five minutes that protect the roof.
  • Inspection of both indoor units and both indoor drains, which are active only in cooling mode.
  • Run both heads in both modes for about thirty minutes each month, including during the off-season, so that a zone that has been shut down does not start up dirty when first called upon.
  • Recording the serial numbers by component, measured lengths, weighed added charge, and commissioning readings in the file.

Subsidies and documentation

An efficient wall-mounted heat pump installed in a residence may qualify for residential assistance programs, particularly those offered by Hydro-Québec and Rénoclimat. The criteria and efficiency thresholds change regularly: we verify eligibility when the file is opened, without announcing an amount in advance. The Chauffez vert program, however, is intended to replace fossil-fuel heating and does not apply to a home already heated with electricity.

Two administrative points specific to this type of project. First, the SEER2, HSPF2, and EER2 ratings certify a combination of an outdoor unit and indoor units in a given configuration—which explains the three series of AHRI codes published for each model—and the code declared in the file must match what was actually installed; we developed this point in Saint-Anicet. Second, a rooftop installation adds a document to the file for the client to keep: the photographic record of the interface with the membrane and, if applicable, the roofer's certificate for any penetration made. When the roof is redone or a claim is opened, this document will answer the question of who did what.

Why entrust your installation to AirGreen

A rooftop installation involves two trades and two warranties: ours for the equipment, and the roofer's for watertightness. Most of the problems we correct with this type of installation come from a contractor who treated the roof as a support surface rather than as a roofing assembly.

What we systematically put in writing before the work begins: the exact outdoor unit model and the reason for choosing it; the capacity of each head, room by room; the planned route, including its lengths and estimated additional charge; the AHRI code corresponding to the actual configuration; the roof-support method and the fact that we perform no penetrations; the estimated balance point; the exact scope of finishing work—and what the system will not do.

We serve Dollard-des-Ormeaux, the entire West Island, Montreal, Laval, Longueuil, the North Shore, and the South Shore for HVAC installation, commissioning, and HVAC maintenance of wall-mounted and multi-zone systems.

Have your project assessed

If your home has a flat roof and you are considering a two-zone heat pump, two questions arise before any quote: how old is your membrane, and which rooms on the top floor are beneath the proposed location. Contact AirGreen for an on-site technical assessment, route mapping, a detailed room-by-room quote, and an installation schedule.

The steps

The big day, step by step

The main steps of this kind of job at AirGreen. Every house has its quirks: the estimate brings them out.

Step 1 of 9The on-site estimate

We look at the room, the outside wall, the line route and where the outdoor unit will go. That is where the capacity gets chosen.

  1. The on-site estimateWe look at the room, the outside wall, the line route and where the outdoor unit will go. That is where the capacity gets chosen.
  2. The quoteModel, capacity and price, in writing. We also check whether the model qualifies for assistance programs.
  3. Getting readyFloors and furniture protected, wall plate position marked level, wall opening located.
  4. The wall openingA single opening, with the slope the drain needs to flow outside.
  5. The outdoor unitSet on a stand raised above the snow, with the clearances the manufacturer requires.
  6. Lines, cable and drainConnected, insulated and protected. The opening is then sealed against water, cold air and insects.
  7. The electrical workA dedicated circuit and an accessible disconnect near the outdoor unit.
  8. Tests and start-upLeak test, vacuum, then start-up and a check of heating and cooling.
  9. The walkthroughRemote, modes, filters: we show you the essentials before we leave.
Your numbers

What would it look like at your place?

Two quick checks with real numbers: what heat costs, and what your current heaters add up to in BTU/h.

Size checkYour baseboards, in BTU/h
–BTU/h of installed electric heat

    Conversion: 1 W = 3.412 BTU/h. An indication, not a load calculation: baseboards and furnaces are often stronger than the real need, and they can stay as backup. AirGreen confirms the capacity on site.

    Mistakes avoided

    Four mistakes we do not make

    Flip each card to see what we do instead.

    Going further

    Your own project, step by step

    Through the seasons

    What to do, season by season

    Three habits per season for this unit. They take a few minutes and prevent many calls.

    • Clean the indoor unit's filters.
    • Clear leaves and debris left on the outdoor unit by winter.
    • Test cooling before the first hot days.
    At your place

    Is your home ready?

    Check what applies at your place. A "no" is not a refusal: it is what we sort out during the estimate.

    0 / 6 checked
    True or false

    Four statements: true or false?

    It all comes down to details you have just seen.

    1. In heating mode, the outdoor unit can produce water.

    2. You pick the capacity with a simple square-footage rule.

    3. A multi-zone connects several indoor heads to a single condenser.

    4. The disconnect can sit behind the patio furniture.

    Frequently asked questions

    What people ask us about this kind of work

    12 questions
    Does a wall-mounted heat pump heat in winter?
    Yes, it heats and cools. Its capacity drops in very cold weather; the operating range depends on the model and is listed on its spec sheet.
    Wall-mounted or multi-zone: how do I choose?
    One wall head and one condenser outside: the direct solution for a room or an open area. For two to five rooms, a multi-zone puts one head in each room on a single condenser.
    Where does the outdoor unit go?
    Where it stays above the snow, clear and accessible, away from walkways. We decide it with you during the estimate.
    Are there grants?
    Depending on the model and your situation, assistance programs may apply, including Hydro-Québec's LogisVert. AirGreen checks the model number before quoting an amount. See the grants.
    Do I need a permit?
    Rules vary from city to city: location, distances, noise. See permits and by-laws, and we check for your address.
    How cold can it heat?
    It depends on the model. According to Hydro-Québec, newer models work down to a temperature between −15 °C and −25 °C, and some cold-climate models are certified lower. The minimum temperature is on each unit's spec sheet.
    How much can I save?
    Hydro-Québec says a heat pump can be up to three times more efficient than baseboards for heating in the colder months. The result depends on the house, the climate and how it is used.
    How is the LogisVert assistance calculated?
    For ENERGY STAR cold-climate certified heat pumps, Hydro-Québec lists assistance of $120 per 1,000 BTU/h of heating capacity at −8 °C. AirGreen checks the exact model before quoting an amount; only Hydro-Québec confirms the assistance granted. See the grants.
    Is it noisy?
    The sound level depends on the model and is listed in decibels on each unit's spec sheet. Location matters too: when possible, we avoid putting the outdoor unit under a bedroom window.
    The outdoor unit is covered in ice: is that normal?
    Some frost is: the unit runs defrost cycles. Never hit the ice. If the unit stays iced up or stops heating, call us.
    Does AirGreen hold the required licences?
    Yes. AirGreen holds RBQ licence 5645-9605-01, subclasses 15.8 Ventilation, 15.10 Refrigeration and 16 Electricity.
    Is the estimate free?
    Yes. The on-site estimate is free and the quote follows within 24 hours. Book my free estimate.

    Could this job help a neighbour?

    Share
    Similar projects

    More jobs to see, near you

    By town, by equipment or by region: browse more than 4,700 published projects.

    Each dot: a town where AirGreen has published projects. The glowing dot: this job.

    All our projects

    Your project

    Every house has its constraints. We see them before we install.

    The on-site estimate is free and the quote follows within 24 hours.

    • RBQ licence5645-9605-01 · 15.8, 15.10, 16
    • EstimateOn site, free
    • QuoteWithin 24 hours

    Text and photo: a real AirGreen Climatisation & Chauffage job. The diagrams are generic illustrations of the type of installation, not a survey of this job site. Sources of the added figures: airgreen.ca product pages (NEEP / AHRI performance), Hydro-Québec (Heat pumps page, LogisVert, read on 13 October 2026), Régie de l’énergie (rate D as of 1 April 2026).

    Leave a comment