Your building heats and cools empty space. Automation stops it. HVAC controls, thermostats and peak shedding in Montréal, Laval, Longueuil, the South Shore and the North Shore
A week has 168 hours. Open 60 hours? Your building is empty 108 hours out of 168. We program those hours, and cut the winter peak you pay for all year.
Map your week. We show you the hours your HVAC wastes.
A building without controls keeps the same setpoint day and night. The grid shows how many hours it heats or cools for nobody.
Your week, hour by hour
Start from a template, then click or drag across cells to adjust your occupied hours.
What automation does with those hours: setpoints lowered or raised, ventilation reduced within code limits, and a calculated recovery so everything is comfortable at opening.
The winter peak is paid all year. See what one less kW is worth.
Load shedding means staggering or cutting equipment during the few quarter-hours that set your peak. Move the sliders to match your bill.
Your peak, your rate
Account under 50 kW on rate Flex G
During an event: 56.516 ¢/kWh instead of 10.173 ¢. Each kWh cut avoids about $0.46.
Indicative, before taxes, Hydro-Québec rates of April 1, 2026 (rate G: $22.071/kW above 50 kW; rate M: $18.242/kW). Hydro-Québec measures demand in 15-minute intervals.
Have my bills analyzedSix functions, one logic: the right equipment at the right time.
Nights, weekends, holidays. Weather-based recovery so you are ready at opening.
16Staggered starts and short cuts during winter’s critical quarter-hours.
16CO2 sensors: more air when the room is full, less when it is empty, within code limits.
15.8Locked smart thermostats, allowed ranges, grouped zones.
16Alerts when a walk-in warms, a unit fails or a door stays open.
15.10 · 16Sub-meters and dashboards, useful for the 21-042 declaration.
16From visit to first season, six steps.
Equipment, existing controls, electrical panels.
We find the winter peak and what causes it.
Schedules, shedding sequences, alarms: written before the quote.
Controllers, sensors, relays. Electrical licence 16.
Each sequence tested and your team trained.
We compare the peak before and after, and adjust.
HVAC controls and wiring with us. Security and gas with a partner.
Ducts, grilles, diffusers, air exchangers, make-up air, duct-mounted humidifiers.
Heat pumps, air conditioning, VRF, walk-in coolers, refrigerant piping.
Equipment power, controls, thermostats, sensor wiring (CMEQ).
- Alarms, cameras, access controlBSP permit
- Gas burners and valves15.2
- Boilers and hot water15.4
AirGreen holds RBQ licence 5645-9605-01, subclasses 15.8, 15.10 and 16. Anything outside those subclasses goes to a partner who holds the right licence, and we tell you before you sign.
What rules and rates change for an automated building.
Tap a card for details.
Six mistakes that cancel the savings of an automated system.
A simultaneous restart creates the peak you wanted to avoid. We stagger starts.
Without allowed ranges, the setpoint ends up at the maximum. We set limits.
In the sun or near a door, it fools the whole system.
Without an open protocol or program access, you depend on one provider.
Cold space at opening, and someone disables everything. We calculate recovery.
A schedule that no longer fits gets bypassed. We train your team.
What people ask us about building automation.
What is building automation?+
It is the automation of a commercial building’s systems: heating, cooling, ventilation and, depending on the project, lighting. It is also called a BMS or BAS. The goal: run each piece of equipment only when needed.
Does my small business need it?+
Not always a full system. Well-set, locked programmable thermostats often handle the essentials. Beyond a few zones or a peak above 50 kW, central control pays back faster.
How does automation lower the bill?+
Two ways. It avoids heating and cooling empty space (energy). It staggers and sheds equipment as the peak approaches (demand, billed $22.071 per kW above 50 kW on rate G).
What is minimum billed demand?+
On rates G and M, billed demand is never below 65% of the peak reached during the winter period (December 1 to March 31) of the last 12 months. Cutting the winter peak therefore also lowers summer bills.
Does automation help with rate Flex G?+
Yes. During a Flex G event, energy costs 56.516 ¢/kWh instead of 10.173 ¢. A programmed system can lower setpoints and stagger equipment during those hours, announced the day before.
Can we keep our existing equipment?+
Often yes. We add controllers, sensors and relays to the equipment in place. Anything that cannot be controlled is noted in the quote.
Do you do cameras, alarms and access control?+
No. In Québec, installing electronic security systems requires a permit from the Bureau de la sécurité privée. We coordinate with your provider; we don’t install it.
Is the system open or proprietary?+
Always ask for an open protocol, such as BACnet, and full access to your programs. You stay free to change providers.
Does it help with By-law 21-042 reporting?+
Yes, consumption data and sub-meters make the annual declaration required in Montréal for buildings of 2,000 m² or more, or 25 units or more, easier.
Is there an incentive?+
Hydro-Québec reviews business efficiency projects under Efficient Solutions. Have Hydro-Québec confirm your project’s eligibility before you sign.
No question matches. Call us at 514 316-2973, we will answer.
Your need often touches a neighbouring service.
The services most often combined with this one, plus the full needs search.
A building that follows your schedule, not the reverse.
Send us your last 12 bills and your schedule. We come back with a priced control plan, free.
Sources checked on November 2, 2026.
- Hydro-Québec, Electricity rates in effect April 1, 2026 (rates G, Flex G and M).
- City of Montréal, By-law 21-042 (page updated September 8, 2026).
- Regulation respecting occupational health and safety (CQLR, c. S-2.1, r. 13), ss. 117 to 119 and Schedule IV.
- Private Security Act (CQLR, c. S-3.5): Bureau de la sécurité privée permit for electronic security systems.
- Hydro-Québec, Efficient Solutions, March 2026 guides.
Amounts shown are indicative estimates, before taxes. Only Hydro-Québec, Énergir and the responsible bodies confirm a rate or an approved incentive.
