Your building fits no box? We start from it, not from a catalogue. Custom HVAC solutions in Montréal, Laval, Longueuil, the South Shore and the North Shore

Answer four questions: type of space, constraints, floor area, priority. The three system families that fit show up, with their reasons and what to watch for.

7system families compared by the configurator
15.8 · 15.10 · 16our RBQ subclasses: ventilation, refrigeration, electrical
Zone by zoneloads calculated at the visit before choosing the system
RBQ5645-9605-01
Estimatefree, on site
Quotein 24 h
Final priceconfirmed before work
01 · Configurator

Four questions, three system families that make sense.

Each answer adds or removes points from the families. Results change live, with the reasons.

What type of space?

02 · Heat pump or baseboards

What a heat pump changes on your heating bill.

A heat pump moves heat instead of making it. Enter your current electric heating and pick an efficiency assumption.

Your electric heating

Find the heating consumption on your winter bills, or keep the example.

5,000 kWh500,000 kWh
Energy savings per year
–

before taxes, order of magnitude

Today–
With heat pump–
Energy avoided–
Price used–
Baseboards and heaters–
Heat pump–

Consumption ÷ chosen seasonal efficiency. Demand charge and deep-cold backup not included. Real efficiency depends on the model and climate.

Get my project calculated
03 · Families

The seven system families, side by side.

A custom project often combines two: for example VRF for offices and make-up air for the kitchen.

FamilyBest forRoof neededDucts
Rooftop unitRetail, large open floorsYesYesOpen →
VRFOffices, multi-tenant, opposite zonesNoOptionalOpen →
Wall, cassette, ducted splitsSmall areas, older buildingsNoRarelyOpen →
PTACHotels, residences, roomsNoNoOpen →
Central heat pumpReplacing a furnace, existing ductsNoYesOpen →
Make-up airRestaurants, shops with exhaustOftenYesOpen →
Unit heaters, air curtainsWarehouses, overhead doorsNoNoOpen →
04 · Hard cases

The buildings that fit no box.

HeritageProtected facade and roof

Discreet systems, thin refrigerant lines, permits checked before ordering.

No roofRoof full or too weak

Outdoor units on the ground or wall, VRF or splits.

ShoulderOne zone hot, another cold

Server room and offices, south-facing storefront and back room.

TenantsSeveral occupants, one bill

One unit per suite or allocation by indoor unit.

OilLeaving an old boiler

Electric heat pumps, with the old unit removed by a licensed partner.

KitchenA hood that empties the room

Tempered make-up air, or doors whistle and cold gets in.

05 · Steps

From configurator to start-up.

Configurator

A first direction, here, in 2 minutes.

Visit

Survey of the building, zones, equipment and bills.

Loads by zone

Heating and cooling needs calculated before choosing.

Quote in 24 h

System confirmed in writing, partners named, final price before work.

Installation

Scheduled around your business hours, then started up.

06 · Incentives

The incentives that most often apply to a custom project.

The programs that most often apply to commercial projects, with their detailed page.

07 · Licences

What we do, and who does the rest.

15.8Ventilation

Ducts, grilles, diffusers, air exchangers, make-up air, duct-mounted humidifiers.

15.10Refrigeration

Heat pumps, air conditioning, VRF, walk-in coolers, refrigerant piping.

16Electrical

Equipment power, controls, thermostats, sensor wiring (CMEQ).

A licensed partner
  • Natural gas or propane, removing a gas unit15.2
  • Removing an oil burner or tank15.3
  • Hot-water heating, boilers15.4
  • Load of a unit on an older roofEngineer

AirGreen holds RBQ licence 5645-9605-01, subclasses 15.8, 15.10 and 16. Anything outside those subclasses goes to a partner who holds the right licence, and we tell you before you sign.

08 · Pitfalls

What derails a custom project.

CatalogueChoosing the unit before the building

Without a load calculation, you buy too big or too small.

Fresh airForgetting ventilation

Splits and PTACs do not replace required fresh air.

RoofInstalling without checking the load

A heavy unit on an older roof is checked first.

PermitsOrdering before permits

Facade, roof, noise: the municipality may require changes.

IncentivesSigning before the incentive is confirmed

Some incentives require an application before work.

PartnersNot knowing who does the gas

A clear quote names every licence.

09 · Frequently asked questions

What people ask us about custom projects.

When is a project “custom”?

When no standard system fits as is: no usable roof, zones with opposite needs, an older building, several tenants, leaving oil or gas. We then combine several system families.

Does the configurator replace a visit?

No. It points the way. At the visit we calculate loads zone by zone and confirm the system in writing before the quote.

Can we keep part of the old system?

Often. Ducts in good shape, a roof curb or an electrical circuit can be reused. We check it at the visit.

Do you take our building off gas or oil?

We design and install the electric system that replaces the old one. Disconnecting and removing the gas (15.2) or oil (15.3) unit is done by a licensed partner.

What if we want to keep gas as backup?

That is dual energy. Énergir has a program for gas-heated businesses adding a heat pump. The gas side stays with a 15.2 partner.

Can our roof carry a unit?

It has to be checked. For a heavy unit or an older roof, a structural engineer confirms the load before the work.

Does a heritage building have special rules?

Often, yes: facade, roof and openings may be regulated by the municipality. We choose discreet systems and check permits before ordering.

How long does a custom project take?

It depends on size and equipment lead times. You get the quote within 24 h of the visit, then a written schedule with the order.

Is the heat pump vs baseboard calculation exact?

It is an order of magnitude: your heating consumption divided by an assumed seasonal efficiency, at the Hydro-Québec rate of April 1, 2026. Real efficiency depends on the model and climate.

Are there incentives for a custom project?

Often: Hydro-Québec Efficient Solutions, Énergir dual energy, a federal tax credit for some corporations. Have each body confirm the incentive and any stacking before signing.

Keep exploring

Your need often touches a neighbouring service.

The services most often combined with this one, plus the full needs search.

AirGreen · Custom

Send us your configurator answers, we start from there.

Free on-site estimate across Greater Montréal. Quote in 24 h, final price confirmed before work. Showroom in Boucherville.

RBQ 5645-9605-01Ventilation 15.8 · Refrigeration 15.10 · Electrical 16
$5M insuranceCivil liability, from start to finish
Free estimateOn site, across Greater Montréal
Quote in 24 hFinal price confirmed before work

Sources checked on November 2, 2026.

  • Hydro-Québec, Electricity rates in effect April 1, 2026: rates G and M.
  • Hydro-Québec, Efficient Solutions: small business and medium and large business streams, March 2026 guides.
  • Énergir, commercial dual-energy program (accessed November 2, 2026).
  • Government of Canada, Clean Technology Investment Tax Credit (30%).
  • Régie du bâtiment du Québec, licence subclasses 15.2, 15.3, 15.4, 15.8, 15.10 and 16.

Amounts shown are indicative estimates, before taxes. Only Hydro-Québec, Énergir and the responsible bodies confirm a rate or an approved incentive.