The L in the number means cold climate
In VPC072L4M-4Y, LENNOX prints “L = COLD CLIMATE (LOW AMBIENT)”. The standard Varix carries an S in that spot, and the final Y means 208/230 V three-phase.
LENNOX, VRF nomenclature 38Z31 (April 2025).LENNOX advertises 100% heating capacity at -22 °F (-30 °C). The table in the same flyer gives the 6-ton module 78,000 BTU/h at -30 °C, against 81,000 at 8.3 °C: 96%. The full 100% holds down to -25 °C. We show you both, module by module, with what each one asks of the panel at 208-230 V.
From 6 to 24 tons: one module up to 10 tons, two up to 16, three up to 24. Price on quote, after we visit the building.
One source for the heat: the table in LENNOX flyer 38Y93, the same at 208-230 V and 460 V. Cold frequencies come from the 1991-2020 Montréal-Trudeau normals. The current shown is the 208-230 V figure.
LENNOX table: Varix Extreme flyer 38Y93 (April 2025), heating at 47, -13 and -22 °F, same values at 208-230 V and 460 V. LENNOX publishes no colder value, and no registry (ENERGY STAR, NEEP) lists these modules. MCA: minimum circuit ampacity; max. protection: MOCP.
LENNOX table (flyer 38Y93): 96% of the 81,000 BTU/h the same module gives at 8.3 °C.
LENNOX does not say what its 100% is measured against. We stick to the numbers in the table.
LENNOX table 38Y93Nominal: 72,000 BTU/hWorst morning 1991-2020: nothing published
The worst morning of 1991-2020 at Montréal-Trudeau: -31.8 °C, on January 27, 1994. A night below -30 °C comes back about every five years (0.21 a year).
Below -30 °C, LENNOX publishes nothing more: the project designer plans backup heat for those hours.
| Outdoor | 6 tons | 8 tons | 10 tons |
|---|---|---|---|
| 8.3 °C47 °F | 81,000 | 108,000 | 135,000 |
| -25 °C-13 °F | 81,000 | 108,000 | 135,000 |
| -30 °C-22 °F | 78,000 | 104,500 | 130,600 |
| Cooling, 35 °C95 °F | 72,000 | 96,000 | 120,000 |
BTU/h. Heating, then cooling. LENNOX, Varix Extreme flyer 38Y93 (April 2025), same values at 208-230 V and 460 V.
At the same tonnage, both give the same nominal cooling and the same heat at 8.3 °C, and their submittals stop heating at -22 °F. For the standard Varix, LENNOX publishes no deep-cold heat. At 208-230 V, the Extreme module needs 1.7 to 1.9 times the Varix’s minimum circuit ampacity.
Pink rows are the differences. Extreme: flyer 38Y93 and VPC072L4M-4G submittal; Varix: “Varix VRF” and LC1178 guides (March 2025), VRC072S4M-4Y submittal. The standard 208-230 V Varix units have their own page.
The voltage is read from each product’s number: Y = 208/230 V three-phase, G = 460 V three-phase (LENNOX nomenclature 38Z31). From 12 to 24 tons, LENNOX combines two or three modules; its guides give no reliable values for these combinations, so we take them from the project’s LENNOX selection report.
| Model | Capacity | Nameplate voltage | MCA / max. protection | Heat at -30 °C |
|---|---|---|---|---|
| VPC096L4M-4Y | 8 tons · 1 module | 208-230 V, three-phase | 62 / 70 A | 104,500 BTU/h |
| VPC072L4M-4Y | 6 tons · 1 module | 208-230 V, three-phase | 50 / 60 A | 78,000 BTU/h |
| VPC288L4M-4Y | 24 tons · 3 modules | 208-230 V, three-phase | Depends on the modules chosen (project’s LENNOX selection) | |
| VPC264L4M-4Y | 22 tons · 3 modules | 208-230 V, three-phase | Depends on the modules chosen (project’s LENNOX selection) | |
| VPC240L4M-4Y | 20 tons · 3 modules | 208-230 V, three-phase | Depends on the modules chosen (project’s LENNOX selection) | |
| VPC216L4M-4Y | 18 tons · 3 modules | 208-230 V, three-phase | Depends on the modules chosen (project’s LENNOX selection) | |
| VPC192L4M-4Y | 16 tons · 2 modules | 208-230 V, three-phase | Depends on the modules chosen (project’s LENNOX selection) | |
| VPC168L4M-4Y | 14 tons · 2 modules | 208-230 V, three-phase | Depends on the modules chosen (project’s LENNOX selection) | |
| VPC144L4M-4Y | 12 tons · 2 modules | 208-230 V, three-phase | Depends on the modules chosen (project’s LENNOX selection) | |
| VPC120L4M-4Y | 10 tons · 1 module | 208-230 V, three-phase | 76 / 90 A | 130,600 BTU/h |
In VPC072L4M-4Y, LENNOX prints “L = COLD CLIMATE (LOW AMBIENT)”. The standard Varix carries an S in that spot, and the final Y means 208/230 V three-phase.
LENNOX, VRF nomenclature 38Z31 (April 2025).That is what LENNOX advertises for the Extreme outdoor units, without stating the size or the measuring distance. For scale: 50 dB(A) is moderate rain; 60, a normal conversation.
LENNOX, flyer 38Y93; Québec.ca, “Noise measurement” (2022).One module covers 6 to 10 tons, two modules 12 to 16 tons, three modules 18 to 24 tons. One system takes up to 64 indoor units.
LENNOX, flyer 38Y93; guide 38V34, p. 10.It depends on the base, and LENNOX does not give it. Flyer 38Y93 advertises 100% heating capacity at -22 °F (-30 °C). Its table gives the 6-ton module 78,000 BTU/h at -22 °F, and 81,000 at -13 °F as at 47 °F. Against the nominal 72,000 BTU/h, that is 108%; against the heat at 8.3 °C, 96%. We stick to the numbers in the table.
The LENNOX table stops at -22 °F (-30 °C), as does the heating range on the LENNOX submittal (-22 to 75 °F). The worst morning of 1991-2020 at Montréal-Trudeau was -31.8 °C, on January 27, 1994, and a night below -30 °C comes back about every five years. The designer plans backup heat for those hours.
At the same tonnage, same nominal cooling and same heat at 8.3 °C. The Extreme publishes what it keeps in deep cold (96 to 97% at -30 °C); the standard Varix does not. On the other hand, the 6-ton Extreme module draws 50 / 60 A at 208-230 V, against 28 / 35 A for the Varix. The comparison above shows it size by size.
At low voltage, Hydro-Québec’s voltage bulletin names only 120 V single-phase and 600 V three-phase. A building that already has a 208 V three-phase distribution can feed the 208-230 V Extreme; otherwise it takes a transformer. Your electrician confirms what the building has. The Extreme also comes in 460 V, not in 575 V.
No, it is an option. LENNOX offers a Wi-Fi adapter among its VRF controls, along with the wireless remote, wired wall controls, the central touch controller and the BACnet gateway.
The W900015-01 VRF certificate gives 10 years only when the installation meets three LENNOX conditions: a design approved by LENNOX VRF Technical Support before purchase, installation by a contractor trained on the LENNOX VRF course, and an approved commissioning report and maintenance plan. Otherwise: 7 years on the compressor and 1 year on other parts. Controls get 1 year. Labour is not covered by LENNOX.
We show none. We found no AHRI number and no ENERGY STAR listing for these modules (registry checked October 28, 2026); the LogisVert guide requires ENERGY STAR certification, and the Hydro-Québec program is for residential customers.
We don’t guess it over the phone. We come and see the building, its rooms and its electrical service. For the 10-year warranty, the design must then be approved by LENNOX VRF Technical Support before purchase.
We come and see the building, its roof and its electrical service. The quote lists the exact LENNOX models, their nameplate voltage and what each module asks of the panel.
Price on quote. Free on-site estimate.