THERMO 2000 VoltMax SCR VOLTSCR60030P3 Commercial Electric Boiler | 30 kW - 600V 3 Phase

In stock

Thermo 2000’s VoltMax SCR at 30 kW, 600 V three phase: a commercial electric boiler that connects at the building’s voltage and draws 28.9 A.

Model numberVOLTSCR60030P3

28.9 Aat 600 V three phase, full output
102,360 BTU/h30 kW
0-100%SCR output modulation
600 V · three phaseSCR modulationCommercial boiler
Ask for a quote

514 316-2973 · sales@airgreen.ca

Quick facts

Model numberVOLTSCR60030P3
ManufacturerThermo 2000
DesignationVOLTMAX SCR 30-600-3 PH
Output30 kW (102,360 BTU/h)
Power supply600 V, three phase, 60 Hz
Current28.9 A
Manufacturer warranty10 years tank · 2 years components

30 kW connected directly to 600 V three phase, for only 28.9 A

Why a 600 V version

600 V three phase supplies many commercial and industrial buildings and large apartment buildings in Quebec. In these buildings, Thermo 2000’s VoltMax SCR 30-600-3 PH connects directly to the available voltage. It delivers 30 kW, or 102,360 BTU/h according to the manufacturer, and draws only 28.9 A at full output.

It is an electric hot-water boiler designed for commercial, institutional and multi-unit buildings. It feeds a loop of radiators, baseboards or radiant floor, with no GHG emissions on site. It suits a Laval warehouse heated by a radiant floor, a school or clinic in Longueuil, or a large Montreal building heated by a central loop.

What the VoltMax does day to day

The VoltMax combines relay stages, which its controller alternates, with a solid-state relay (SCR) that modulates output from 0 to 100%. According to Thermo 2000, this modulation limits peak power demand. Its Incoloy immersion elements are replaceable, and the manufacturer presents it as a clean, quiet, low-maintenance boiler.

The Schneider Electric controller, with a 3 in backlit display, sets the setpoint from 50 °F to 200 °F, applies outdoor reset with the included sensor and runs schedules. It communicates over BACnet IP or MS-TP, accepts an external 0-10 Vdc control and sends its alarms by email through its Ethernet port. A 2nd setpoint can also feed an indirect water heater.

Installation: the steps

  1. Free on-site estimate: voltage and capacity of the electrical service, existing loop, mechanical room.
  2. Written quote, with the circulator and expansion tank, which are not among the supplied parts, and the low-water cut-off if the project requires it (optional at this size).
  3. Placing the 310 lb (141 kg) boiler with Thermo 2000’s clearances: 3 in at the sides and rear, 24 in at the front, 32 in above.
  4. Connection to the loop through the four 1 1/2 in male NPT side connections, and piping of the factory-installed relief valve discharge.
  5. 600 V electrical connection, with protection and conductors sized from the nameplate, under AirGreen’s RBQ licence 5645-9605-01 (ventilation, refrigeration and electrical).
  6. Outdoor sensor installation, filling, purging and setting of the setpoint, schedules and alarms.

AirGreen is a family business established in Montreal for more than fifteen years, also installing on the South Shore and the North Shore. Thermo 2000 warrants the tank for 10 years (limited warranty, closed-loop heating) and the electrical and mechanical components for 2 years.

Contact us

Ask for a free estimate for your building: the quote is in writing, and financing is available to spread out your payments.

01 · What it is for

A commercial boiler for buildings supplied at 600 V

The VoltMax SCR heats the water of a loop of radiators, baseboards or radiant floor. This version connects directly to a 600 V three-phase supply, drawing 28.9 A at full output.

  • Commercial or industrial building supplied at 600 V three phase
  • Large multi-unit building with a central heating loop
  • Warehouse or workshop heated by a radiant floor
  • School, clinic or other institutional building
28.9 A at full outputOn 600 V three phase, the 30 kW connects at the building’s voltage with a low current.
Replaceable Incoloy elementsReplaceable immersion elements and relay-stage rotation, for simple maintenance according to Thermo 2000.
BACnet or email monitoringBACnet IP / MS-TP, web page and email alarms through the Ethernet port.
02 · Specifications

Specifications

From the manufacturer’s documentation. A value the manufacturer does not publish is not listed.

ManufacturerThermo 2000
SeriesVoltMax SCR
Manufacturer designationVOLTMAX SCR 30-600-3 PH
TypeCommercial electric hot-water boiler, SCR modulation
Output30 kW
Output in BTU/h102,360 BTU/h
Power supply600 VAC, 60 Hz, three phase
Current28.9 A
Heating elementsIncoloy immersion, replaceable
ModulationSCR 0 to 100% (solid-state relay) and relay stages
Water volume11 US gal (41.6 L)
Water connections1 1/2 in male NPT (4 side connections)
Relief valve and drain connections3/4 in female NPT
Temperature setpoint50 °F to 200 °F (10 °C to 93 °C)
ControllerSchneider Electric, 3 in backlit LCD: SCR modulation, stage rotation, outdoor reset, pump contact with or without domestic hot water priority, 2nd setpoint for an indirect water heater, alarm codes, °C/°F, French and English
CommunicationBACnet IP / MS-TP · Ethernet port (web page, email alarms) · external 0-10 Vdc signal (setpoint and output)
Outdoor sensorIncluded
Low-water cut-offOptional at this size (standard above 60 kW)
ClearancesSides 3 in · rear 3 in · front 24 in · top 32 in · floor 0 in
Weight310 lb (141 kg)
Manufacturer configurationA (22.5 to 90 kW)
Manufacturer warrantyThermo 2000: 10 years on the tank (limited warranty, closed-loop heating); 2 years on electrical and mechanical components (parts and accessories)
StandardsCSA C22.2 No. 165-92, UL 834, CSA B-51-14, ASME Section IV (H), CRN
Model numberVOLTSCR60030P3
03 · Before installing

What to know before installing

  • Commercial boiler for a 600 V three-phase, 60 Hz supply: the building’s voltage is confirmed on site before ordering.
  • Protection and conductors are sized from the unit’s nameplate.
  • The low-water cut-off is optional at this size; it is standard above 60 kW.
  • The circulator and the expansion tank are not among the supplied parts.
  • Clearances: sides 3 in, rear 3 in, front 24 in, top 32 in, floor 0 in. Weight: 310 lb (141 kg), plus 11 US gal of water.
In the box
  • Schneider Electric controller with backlit LCD
  • Outdoor temperature sensor
  • ON/OFF control switch
  • Control and power fuses and breakers
  • SCR relay
  • Two high-limit controls (automatic and manual)
  • Factory-installed relief valve
  • Drain valve
04 · Documents

Manufacturer documents

05 · See also

Explore the range

Same category
Electric boilers
See all
Same brand
THERMO 2000
See all
06 · Questions

Frequently asked questions

Why choose the 600 V version?

Because your building is supplied at 600 V three phase. The boiler then connects directly at that voltage and draws only 28.9 A at full output. We confirm the voltage on site before ordering.

Can it replace an existing electric boiler?

Yes, if the loop is suitable. The VoltMax connects through four 1 1/2 in male NPT side connections. We check the loop, circulator and expansion tank in place during the estimate.

What maintenance does it need?

Thermo 2000 presents it as a clean, quiet, low-maintenance boiler. Its Incoloy immersion elements are replaceable, and the controller alternates the relay stages.

Is the low-water cut-off included?

Not at this size: it is optional, and becomes standard above 60 kW. We add it to the quote when the project requires it.

What warranty does Thermo 2000 offer?

10 years on the tank (limited warranty, closed-loop heating) and 2 years on electrical and mechanical components, parts and accessories.

AirGreen · Montréal, Laval, Longueuil, South Shore, North Shore

A 600 V 30 kW VoltMax SCR, installed by AirGreen

Tell us about your project: we check the sizing, confirm availability and send you a quote. Or let our technicians install it for you.

RBQ 5645-9605-01Ventilation, refrigeration and electrical
Free estimateon site, for any installation
Quote in 24 hby phone or email
Bouchervilleshowroom

Specifications from the manufacturer’s documentation, checked on October 19, 2026.